RX200 S8
Upgrade and Maintenance Manual
309
System board and components
I
Returned system boards without this cover probably have to be
scrapped.
15.6.3 Installing the new system board
Ê
Install the processor as described in section
"Installing the new processor"
on page 227
).
Ê
Check the settings on the new system board (see section
"Onboard
settings" on page 334
).
Ê
Insert the system board by holding it at a slight angle. Slide the connectors
into the connector panel (see figure
239 on page 308
).
Ê
Lower the system board carefully into the chassis.
Ê
Adjust the system board. If necessary adjust the position of the system
board with a gentle twisting motion.
I
When the system board is in the right position, the centre rings engage
with the holes indicated.
Ê
Fasten the system board with the nine screws (see figure
238 on page 307
).
Ê
Install the distance holder (see figure
237 on page 307
).
Summary of Contents for PRIMERGY RX200 S8
Page 30: ...30 Upgrade and Maintenance Manual RX200 S8 Before you start ...
Page 42: ...42 Upgrade and Maintenance Manual RX200 S8 Important information ...
Page 106: ...106 Upgrade and Maintenance Manual RX200 S8 Power supply ...
Page 130: ...130 Upgrade and Maintenance Manual RX200 S8 Hard disk drives solid state drives ...
Page 194: ...194 Upgrade and Maintenance Manual RX200 S8 Expansion cards and backup units ...
Page 210: ...210 Upgrade and Maintenance Manual RX200 S8 Main memory ...
Page 234: ...234 Upgrade and Maintenance Manual RX200 S8 Processors ...
Page 244: ...244 Upgrade and Maintenance Manual RX200 S8 Optical disk drive ...
Page 320: ...320 Upgrade and Maintenance Manual RX200 S8 Cables ...