58
Upgrade and Maintenance Manual
RX200
S8
Basic hardware procedures
4.7
Switching on the server
V
CAUTION!
●
Before switching on the server, make sure the top cover is closed. In
order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
●
After connecting all power cords, wait at least 60 seconds before
pressing the On / Off button.
●
For further safety information, please refer to chapter
"Important
information" on page 31
.
I
This step is only applicable to replace or expand non-hot plug
components.
Ê
Press the On / Off button to start up the server.
Ê
Ensure that the power-on indicator above the On / Off button is lit green.
Ê
Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.
4.8
Handling riser modules
Removing the riser module 1
Figure 13: Removing the riser module 1
Ê
Carefully pull out the riser module 1 upward.
Summary of Contents for PRIMERGY RX200 S8
Page 30: ...30 Upgrade and Maintenance Manual RX200 S8 Before you start ...
Page 42: ...42 Upgrade and Maintenance Manual RX200 S8 Important information ...
Page 106: ...106 Upgrade and Maintenance Manual RX200 S8 Power supply ...
Page 130: ...130 Upgrade and Maintenance Manual RX200 S8 Hard disk drives solid state drives ...
Page 194: ...194 Upgrade and Maintenance Manual RX200 S8 Expansion cards and backup units ...
Page 210: ...210 Upgrade and Maintenance Manual RX200 S8 Main memory ...
Page 234: ...234 Upgrade and Maintenance Manual RX200 S8 Processors ...
Page 244: ...244 Upgrade and Maintenance Manual RX200 S8 Optical disk drive ...
Page 320: ...320 Upgrade and Maintenance Manual RX200 S8 Cables ...