
152
Upgrade and Maintenance Manual
RX200
S8
Expansion cards and backup units
9.4
Expansion cards and riser cards
9.4.1
Installing an expansion card - slot 1-3
9.4.1.1
Preliminary steps
Ê
"Disabling BitLocker functionality" on page 63
Ê
"Disabling SVOM boot watchdog functionality" on page 64
Ê
"Shutting down the server" on page 46
Ê
"Disconnecting the server from the mains" on page 47
Ê
"Getting access to the component" on page 47
Ê
Remove the corresponding riser module as described in section
"Removing
the riser module 1" on page 58
or
"Removing the riser module 2" on
page 59
.
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Software: 5 minutes
Tools:
tool-less
Summary of Contents for PRIMERGY RX200 S8
Page 30: ...30 Upgrade and Maintenance Manual RX200 S8 Before you start ...
Page 42: ...42 Upgrade and Maintenance Manual RX200 S8 Important information ...
Page 106: ...106 Upgrade and Maintenance Manual RX200 S8 Power supply ...
Page 130: ...130 Upgrade and Maintenance Manual RX200 S8 Hard disk drives solid state drives ...
Page 194: ...194 Upgrade and Maintenance Manual RX200 S8 Expansion cards and backup units ...
Page 210: ...210 Upgrade and Maintenance Manual RX200 S8 Main memory ...
Page 234: ...234 Upgrade and Maintenance Manual RX200 S8 Processors ...
Page 244: ...244 Upgrade and Maintenance Manual RX200 S8 Optical disk drive ...
Page 320: ...320 Upgrade and Maintenance Manual RX200 S8 Cables ...