172
Upgrade and Maintenance Manual
CX400
S1
Front panel
11.1
Replacing the front panel board
11.1.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
11.1.2 Preliminary steps
Perform the following procedures:
Ê
"Shutting down the server node" on page 41
Ê
"Removing the server enclosure out of the rack" on page 43
V
CAUTION!
For ALL service tasks, remove the CX400 S1 server enclosure out of
the rack and put it on a separate desk!
It is not allowed to draw the CX400 S1server enclosure partially out
of the rack.
Field Replaceable Units (FRU)
Average hardware task duration: 10 minutes
Summary of Contents for PRIMERGY CX400 S1
Page 12: ...12 Bearbeitungsstand Bestellnummer Content ...
Page 14: ...14 Upgrade and Maintenance Manual CX400 S1 Version history ...
Page 18: ...18 Upgrade and Maintenance Manual CX400 S1 Introduction ...
Page 76: ...76 Upgrade and Maintenance Manual CX400 S1 Basic hardware procedures ...
Page 132: ...132 Upgrade and Maintenance Manual CX400 S1 Hard disk drives solid state drives ...
Page 196: ...196 Upgrade and Maintenance Manual CX400 S1 Cabling 12 3 Cabling Figure 147 2 5 inch chassis ...
Page 197: ...CX400 S1 Upgrade and Maintenance Manual 197 Cabling Figure 148 3 5 inch chassis ...
Page 198: ...198 Upgrade and Maintenance Manual CX400 S1 Cabling ...