36
Upgrade and Maintenance Manual
CX272
S1
Important information
Transporting the server
●
Only transport the server in its original packaging or in packaging that
protects it from impacts and jolts.
For the Japanese market, transporting the device in its original packaging
does not apply.
●
Do not unpack the server until it is at its installation location.
●
Never lift or carry the device by the handles on the front panel.
Notes on installing the server in the rack
●
Never lift the server into the rack using the handles on the front panel.
●
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical manual
for the corresponding rack. The technical manual is supplied with the
corresponding rack.
●
When installing the rack, make sure that the anti-tilt protection is correctly
fitted.
●
For safety reasons, no more than one unit may be removed from the rack at
any one time during installation and maintenance work.
●
If several units are simultaneously removed from the rack, there is a risk that
the rack could tip over.
●
The rack must be connected to the power supply by an authorized specialist
(electrician).
●
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for the type A connector.
Summary of Contents for PRIMERGY CX272 S1
Page 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Page 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Page 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Page 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Page 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Page 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...