CX272 S1
Upgrade and Maintenance Manual
155
Main memory
7.4.4
Concluding steps
Perform the following steps:
Ê
"Installing the memory slot air ducts" on page 45
Ê
"Installing the air duct brackets" on page 47
Ê
"Installing the air duct" on page 49
Ê
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
If applicable, reconnect all external cables.
Ê
"Switching on the server node" on page 73
Ê
"Updating or recovering the system board BIOS and BMC" on page 77
(if
applicable)
Ê
"Enabling boot watchdog functionality" on page 84
Ê
"Verifying the memory mode" on page 85
(if applicable)
Summary of Contents for PRIMERGY CX272 S1
Page 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Page 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Page 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Page 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Page 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Page 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...