
CX272 S1
Upgrade and Maintenance Manual
113
Expansion cards
6.3.1
Installing expansion cards
6.3.1.1
Preliminary steps
Perform the following steps:
Ê
"Disabling SVOM boot watchdog functionality" on page 75
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 41
Ê
"Removing the server node from the Dual Node Cluster Server" on page 42
Ê
"Removing the riser module" on page 68
Ê
"Removing SAS RAID controller" on page 130
(if applicable)
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Software: 5 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Summary of Contents for PRIMERGY CX272 S1
Page 14: ...Upgrade and Maintenance Manual CX272 S1 Contents ...
Page 18: ...18 Upgrade and Maintenance Manual CX272 S1 Introduction ...
Page 92: ...92 Upgrade and Maintenance Manual CX272 S1 Basic software procedures ...
Page 156: ...156 Upgrade and Maintenance Manual CX272 S1 Main memory ...
Page 220: ...220 Upgrade and Maintenance Manual CX272 S1 System board and components ...
Page 234: ...234 Upgrade and Maintenance Manual CX272 S1 Appendix ...