Upgrade and Maintenance Manual
CX2550 M1
Before you start
2.2
Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to
table 1 on page 22
for an overview of steps taken into account for
calculating the average task duration:
Average task duration: 10 minutes
Step
included
Explanation
Server node
shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance are described in section
"Completing the maintenance task" on
page 61
".
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly,
rack installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
Summary of Contents for PRIMERGY CX2550 M1
Page 14: ...Upgrade and Maintenance Manual CX2550 M1 Contents ...
Page 52: ...52 Upgrade and Maintenance Manual CX2550 M1 Basic hardware procedures ...
Page 90: ...90 Upgrade and Maintenance Manual CX2550 M1 Basic software procedures ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 M1 Liquid cooling ...
Page 210: ...210 Upgrade and Maintenance Manual CX2550 M1 Cabling ...
Page 222: ...222 Upgrade and Maintenance Manual CX2550 M1 Appendix ...