CX2550 M1
Upgrade and Maintenance Manual
173
System board and components
Ê
If applicable, reconnect all external cables.
Ê
"Controls and indicators on the server node" on page 51
9.3.3.5
Software configuration
In order to setup the ESXi configuration, the VMware ESXi Recovery Tools CD
is required. An ISO image of the CD is available from the Fujitsu service
partners portal at the following https address:
https://globalpartners.ts.fujitsu.com/com/service/ps/Servers/PRIMERGY/
Pages/default.aspx
.
Ê
Sign in and choose your PRIMERGY server.
Ê
Select the
Software & Tools Documentation
category.
Ê
Download the desired ESXi Recovery CD ISO image, listed under
Tools
.
Ê
Unpack and burn the image to a CD.
Ê
Ensure that no other USB storage device is connected to the server beside
the UFM.
Ê
Insert the Recovery Tools CD into your CD / DVD drive and reboot the
server.
The server should now boot from the Recovery Tools CD.
Ê
Follow the on-screen instructions to initiate the installation.
After the flash process is complete, you will be asked to reboot the system.
I
For the Japanese market, follow the instructions provided separately.
Summary of Contents for PRIMERGY CX2550 M1
Page 14: ...Upgrade and Maintenance Manual CX2550 M1 Contents ...
Page 52: ...52 Upgrade and Maintenance Manual CX2550 M1 Basic hardware procedures ...
Page 90: ...90 Upgrade and Maintenance Manual CX2550 M1 Basic software procedures ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 M1 Liquid cooling ...
Page 210: ...210 Upgrade and Maintenance Manual CX2550 M1 Cabling ...
Page 222: ...222 Upgrade and Maintenance Manual CX2550 M1 Appendix ...