168
Upgrade and Maintenance Manual
CX2550 M1
System board and components
Figure 66: Installing the UFM board (B)
Ê
The UFM module on the plastic spacer must audibly click into place (see
arrow).
9.3.1.4
Concluding steps
Perform the following procedures:
Ê
"Installing the server node in the server enclosure" on page 50
Ê
If applicable, reconnect all external cables.
Ê
"Controls and indicators on the server node" on page 51
9.3.1.5
Software configuration
In order to setup the ESXi configuration, the VMware ESXi Recovery Tools CD
is required. An ISO image of the CD is available from the Fujitsu service
partners portal at the following https address:
https://globalpartners.ts.fujitsu.com/com/service/ps/Servers/PRIMERGY/
Pages/default.aspx
.
Ê
Sign in and choose your PRIMERGY server.
Ê
Select the
Software & Tools Documentation
category.
Summary of Contents for PRIMERGY CX2550 M1
Page 14: ...Upgrade and Maintenance Manual CX2550 M1 Contents ...
Page 52: ...52 Upgrade and Maintenance Manual CX2550 M1 Basic hardware procedures ...
Page 90: ...90 Upgrade and Maintenance Manual CX2550 M1 Basic software procedures ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 M1 Liquid cooling ...
Page 210: ...210 Upgrade and Maintenance Manual CX2550 M1 Cabling ...
Page 222: ...222 Upgrade and Maintenance Manual CX2550 M1 Appendix ...