22
Operating Manual
FibreCAT
TXF
Rack requirements
Installation
DataCenter Rack
–
Telescopic rails screwed to the front (except in the rear left area, where a
support bracket is used).
–
Enhanced cable management in the lateral rack area.
The mounting of the rails in the different racks is described in the next sections.
Installation of the cable management is described in detail in the Technical
Manual for the respective rack.
3rd party rack
The following general conditions apply to rack systems of several other
manufacturers:
–
Installation dimensions (see the dimensions shown in
figure 3 on page 24
):
–
You must ensure that the safety mechanisms on the server, e.g. stoppers or
retaining systems, are functioning correctly.
–
The shape of the rack support uprights must ensure that the telescopic rails
can be bolted at the front.
1
Front of rack
2
Rear of rack
A
Rack depth (comparison PRIMECENTER Rack 1000/1100 mm)
B
Rack width (comparison PRIMECENTER rack 700 mm)
C
Clearance for 19” installation level
C1
Front 19” installation level
C2
Rear 19” installation level
D
Cable routing area (cable area depth) and ventilation
E
Space for front panel and ventilation
F
Space for right and left support systems
P
Rack installation depth
a1
Front left support upright
a2
Front right support upright
b1
Rear left support upright
b2
Rear right support upright
Summary of Contents for FibreCAT TXF
Page 1: ...FibreCAT TXF Backup Subsystem Operating Manual Edition November ...
Page 10: ......
Page 18: ......
Page 48: ......
Page 54: ......