Installation
Installation in the PRIMECENTER Rack or DataCenter Rack
Figure 13: Attaching the carrier rail
Ê
Attach one carrier rail to each side of the backup subsystem with the flat
side.
Figure 14: Installing the backup subsystem - Telescopic rail variant
V
CAUTION!
If you need to lift or transport the backup subsystem, ask someone to
help you.
Ê
Fully extend the fitted telescopic rails (1). They must click into place so that
they can no longer be moved.
V
CAUTION!
The ball bearing cage is part of the telescopic rail and is used to hold the
carrier rail. When installing the subsystem, it is essential to ensure that
the ball bearing cage is engaged in the foremost position. Otherwise, you
run a significant risk of causing serious damage to the telescopic rail
when you install the subsystem.
1
1
1
1
2
5
3
5
1
4
Summary of Contents for FibreCAT TXF
Page 1: ...FibreCAT TXF Backup Subsystem Operating Manual Edition November ...
Page 10: ......
Page 18: ......
Page 48: ......
Page 54: ......