Fuji Clean USA Installation Procedure Checklist cont.
Alarm Panel shall be:
in a well ventilated area as dry and protected from elements as possible
in as close of proximity to the FujiMAC blower as possible
wired by qualified electrician
in a location that allows unencumbered access for inspection and maintenance activity
Step 9: For cold climate installations, please install insulated risers and covers and cover upper half of
treatment unit with min. R-8 value insulating material (i.e. foam board)
Step 10: Float switch electrical cord should exit riser wall through a male adaptor (caulked watertight to
prevent septic gas leakage) or watertight fitting. An interior connection to direct burial cable is also an
acceptable option.
“tep : Prepare Ta k I let a d Outlet for
Sched. 40 Inlet and Outlet Lines (secure with PVC cement).
Step 12: In nearly all cases, the Fuji Clean system will vent properly through the house septic influent line. In
cases where there is an influent pump, or in severe downdraft locations, a separate vent should be
considered. If you do choose to install a vent, be sure that the vent slopes toward the tank so that any
moisture accumulation drips back down toward the tank.
Step 13: During final landscaping, seeding etc., be sure to pitch final grade away from covers to sweep
surface water away from treatment tank.
Step 15: Finalize Controller Wiring. Please have licensed electrician refer to wiring diagram (in Installer
Manual and enclosed separately in alarm/control panel). Upgraded Fuji Clean USA controllers are available
if telecommunications, elapsed time meter or other functions are required. Please contact Fuji Clean USA for
details.
Step 16: Follow start-up procedure detailed in Installation Manual:
□
1. Outside Environment Check.
□
2. Blower Box Check.
□
3. Blower Operation and Blower Alarm Check
□
4. Water Level is at LWL.
□
5. High Water Float Switch Check.
□
6. Set Recirculation Control Valve. (gray)
□
7. Check Recirculation Flow Rate.
□
8. Check/Set Aeration Balance Control Valve (blue).
□
9. Check/Set Effluent Airlift Valve (white).
□
10. Check Effluent Airlift Pipe.
□
11. Add Disinfectant Tablets to Chlorinator (if appropriate)
□
12. Check Alarm/Control Panel
□
13. Final Site Preparation
□
14. Owner Communication - Service Provider and Manual Delivery
34
Summary of Contents for CE Series
Page 8: ...6 ...
Page 11: ...Co troller A Wiri g Diagram 9 ...
Page 12: ...Co troller C Wiri g Diagram 10 ...
Page 14: ...12 ...
Page 22: ... 20 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 41: ... PAGE 1 OF 7 PAGES ...
Page 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Page 46: ...PAGE 7 OF 7 PAGES ...