Installation Procedure
Step 1: Prepare excavation to be at least 1 to 2 feet
larger than Fuji Clean system dimensions as listed below.
I porta t Note: Riser height should ot e eed
.
“tep . Prepare
-
ed of sto e
(
¼
to ½ , le el to ithi / .
Unloading Instructions:
Upon delivery, inspect Fuji Clean tank, both outside and inside for possible damage incurred during
transport. If you find damage, or have a question, please contact your distributor immediately.
Use 4-point
lifting lugs
Step 3: Carefully lower and set
tank. Level to within 1/8-inch.
CEN Series
,
BOD, TSS,
and
Enhanced TN
Model
CEN5
CEN7
CEN10
CEN21
Load Hydraulic* (GPD)
450
630
900
1,900
Blower Model / CFM (Standard)
FujiMAC80RII
2.8 CFM
FujiMAC100RII
2.8 CFM
FujiMAC100RII
3.5 CFM
FujiMAC200RII
7.0 CFM
Power Use (kWh/day)
1.1
1.6
1.6
3.4
Tank Detail:
Height (inches)
65.7
73.6
77.4
87.2
Length (inches)
95.7
98.8
118.9
183.7
Width (inches)
49.2
56.7
68.9
78.3
Weight (lbs.)
463
705
926
1,543
Inlet Invert (inches, to 1/8”)
53
61
62
71
Outlet Invert (inches to
1/8”)
51
59
59.5
69
Access Ports (number)
3
3
3
3
Access Port Diameter (inches)
2@20”
1@24”
2@20”
1@24”
2@20”
1@24”
2@20”
1@24”
23
Summary of Contents for CE Series
Page 8: ...6 ...
Page 11: ...Co troller A Wiri g Diagram 9 ...
Page 12: ...Co troller C Wiri g Diagram 10 ...
Page 14: ...12 ...
Page 22: ... 20 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 41: ... PAGE 1 OF 7 PAGES ...
Page 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Page 46: ...PAGE 7 OF 7 PAGES ...