Please note: To assure tank water tightness, please check in 24 hours to be sure that the water level has
not dropped. Please contact your distributor or Fuji Clean USA if water level has dropped.
Low water line in sedimentation chamber
Step 6: Backfill about ¾ way up
ta k i la ered, o pa ted
lifts using peastone or equivalent
material that form-fits into tank
corrugations.
Step 5: After rechecking that tank is level to 1/8-inch, (fore and aft as well as side to side), fill tank
with fresh water to the low water line mark. Note: Alternate chambers while filling for evenly
balanced fill.
25
Summary of Contents for CE Series
Page 8: ...6 ...
Page 11: ...Co troller A Wiri g Diagram 9 ...
Page 12: ...Co troller C Wiri g Diagram 10 ...
Page 14: ...12 ...
Page 22: ... 20 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 41: ... PAGE 1 OF 7 PAGES ...
Page 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Page 46: ...PAGE 7 OF 7 PAGES ...