Equipment Supplied by Contractor
Risers and Covers per Site & Regulatory Requirements
Note: Tuf-Tite and Polylok Risers in
6” or ”
height increments and covers are available from your
distributor . If not already installed, please refer to page 5 for installation instructions.
Allowed 4” riser height
or less.
Model CE5
: Three (3) 20
Risers
Models CE7, CE10 and CEN Series:
Two (2) 20
Risers
plus One (1) 24-inch Riser
Insulation for Cold Climate Installations
To maintain optimal treatment conditions, Fuji Clean recommends insulated risers and covers as well as
foam board or insulating material (min. R-Value 8) over the upper half of the treatment tank.
Septic Tank and/or Pump Station.
If local code or site conditions mandate. Fuji Clean system are designed to accept straight wastewater.
Fresh Water
Systems must be filled with fresh water to Low Water Mark (LWM) before start-up. Approx. gallons
required per model: (CE5: 435; CE7: 610; CE10: 925; CEN5: 610; CEN7: 925; CEN10: 1,230).
Piping/Conduit
•
“ hedule for i let a d outlet li es.
•
¾ PVC o duit for air li e i i u
-in. deep).
•
Electrical conduit for float switch line (or use direct burial line).
Electrical
•
Please use licensed electrician and adhere to applicable national/local electrical code(s).
•
Two (2) standard 115V, 15A circuits for control/alarm panel connection.
•
Float “ it h Wire: # AWG o es ith sta dard ’
-ft. length). May extend up to 50-ft.
•
Float Switch: May come pre-installed in treatment system. For electrical hookup, please refer to SJE
Rhombus installation instructions.
•
Miscellaneous fittings and connectors to assure watertight connections.
Anti-Float Devices, if necessary
•
Please refer to high water, anti-float recommendations in this manual.
Materials for Blower / Controller Installation
•
Concrete base (or equivalent) on which to set air blower.
•
Protective cover for air blower (vented and able to achieve free airflow in all conditions).
•
Materials or location on which to mount control panel and protect from elements.
Crushed Stone, Fill, Loam etc.
•
Fuji Clean USA is not responsible for design, installation or materials associated with leachfield or
treated wastewater disposal area.
Please note: Proper installation permitting is the responsibility of the installing contractor.
Contractor Installation Manual
–
Residential Systems
22
Summary of Contents for CE Series
Page 8: ...6 ...
Page 11: ...Co troller A Wiri g Diagram 9 ...
Page 12: ...Co troller C Wiri g Diagram 10 ...
Page 14: ...12 ...
Page 22: ... 20 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 41: ... PAGE 1 OF 7 PAGES ...
Page 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Page 46: ...PAGE 7 OF 7 PAGES ...