Fuji Clean USA
●
41-2 Greenwood Road
●
Brunswick Maine 04011
●
Tel: 207-406-2927
●
Fax: 207-406-2929
●
Note:
Please consult Installation Manual for detailed instructions.
Unloading Instructions:
Upon delivery, inspect Fuji Clean tank, both outside and inside for possible damage incurred during transport.
If you find damage, or have a question, please contact your distributor immediately.
Step 1: Prepare excavation to be at least 1 to 2 feet larger than the Fuji Clean tank dimensions. Note: Riser
height should not exceed 24
.
Step 2:
Prepare
-
ed of sto e ¼ to ½ , le el to ithi / .
Step 3: Use 4-point lifting lugs. Carefully lower and set tank. Level to within 1/8-inch.
Step 4: If any part of the tank is below the estimated seasonal high water table, adequate tank uplift
restraint measures should be taken. Please refer to Installation Manual for recommended options.
Step 5: Re-check that tank is level to 1/8-inch, (fore and aft as well as side to side) and then fill tank with
fresh water to the low water line (marked inside tank). Start 24-hour water tightness test. (Please contact
your distributor or Fuji Clean USA if water level has dropped after 24 hours).
“tep : Ba kfill a out ¾ a up ta k i la ered, o pa ted lifts usi g
peastone or equivalent material
that form-fits into tank corrugations.
“tep : Usi g supplied adaptors a d fitti gs, atta h air pipe fitti g to ta k a d o e t to ¾ or o duit
in
prepared tre h i . deep to lo atio of air lo er. Please ote:
flexible irrigation line, 100 PSI Max,
may also be used for the airline.
Step 8: Locate blower within 100-ft. of treatment tank with no more than 5 elbows. If site conditions
prevent this configuration, please contact your distributor or Fuji Clean USA for technical assistance.
Air Blower shall be:
in as close proximity to control panel as possible
on a solid (e.g. concrete) pad to minimize vibrations
in a location above water level
away from grease exhaust fans.
away from bedroom windows and other locations where operational sounds (although minimal)
may be a nuisance
In a location that allows unencumbered access for inspection and maintenance activity
with proper electrical grounding
with wiring and electrical connections made by a licensed electrician.
with no objects on top of electrical cord.
in a well-ventilated space out of direct sunlight and protected from elements such as direct rain
or snowfall.
Fuji Clean USA Installation Procedure Checklist
Summary of Contents for CE Series
Page 8: ...6 ...
Page 11: ...Co troller A Wiri g Diagram 9 ...
Page 12: ...Co troller C Wiri g Diagram 10 ...
Page 14: ...12 ...
Page 22: ... 20 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 41: ... PAGE 1 OF 7 PAGES ...
Page 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Page 46: ...PAGE 7 OF 7 PAGES ...