16
3-3-6 Rack & Tower type EBM Installation
UPS
No.1
EBM
No.2
EBM
Figure 3-9 EBM connection
1. When EBM is connected, the front panel of UPS and EBM is detached.
2. The cutting lack under the front panel center of UPS and the cutting
lack on the EBM front panel center are cut out.
3. The connecting cable of UPS is passed through the cutting lack of
UPS and EBM.
4. The connecting cable of UPS and EBM is connected in front of EBM.
5. The cable is fixed to the cable guide in front of EBM.
6. The front panel of UPS and EBM is installed.
7. In addition, when you install one EBM, it is put under EBM that has
already been installed, repeated step 6 from step 1 in above
mentioned .
UPS
NO.1 EBM
NO.2 EBM
UPS BATTERY CONNECTOR
NO.1EBM CONNECTOR
NO.1 EBM BATTERY CONNECTOR
NO.2 EBM CONNECTOR
UPS FRONT PANEL
NO.1 EBM FRONT PANEL
NO.2 EBM FRONT PANEL
NO.1EBM FRONT PANEL : LOWER CUTTING LACK PART.
NO.2EBM FRONT PANEL : UPPER CUTTING LACK PART.
NO.1EBM FRONT PANEL : UPPER CUTTING LACK PART.
Summary of Contents for PEN102J1C
Page 8: ...1 1kVA 1 5kVA VII...
Page 9: ...VIII 2 4kVA...
Page 10: ...3kVA IX...
Page 11: ...Tower Type The attention label becomes it as follows 1kVA X...
Page 19: ......
Page 27: ...8 Figure 1 Need Space...
Page 84: ......
Page 85: ......