14
2. Make the utility power source non-earth. However, ground the Nutral
side when you ground UPS.
Table 3-1 Selection of distribution breaker and screw size of UPS terminal
WIRE(Recommendation)
UPS terminal
Cap
Input
Voltage
Output
Voltage
Distribution breaker
(Recommendation)
Input
Output
Earth
Size
Torque
3kVA
100V
100V
50A
AWG No.8
M5
22.5lb・in
a) Wiring
Use the wire protection when you connect the wire cable with the terminal.
Wire protection can be an put on the back or the bottom of the TB cover.
Remove the round part of the TB cover, and put it. When removing, the cutting
lack side can be removed by strongly pushing the right and left (i and ⅱ)
several times in the driver as shown in the figure below. Do not beat strongly
Do not push the driver into the space. (ⅲ) The TB cover is damaged. Please
note it.
(i) (ⅱ) (ⅲ)
b) Details when wire protection is used
N
L
N
L
M5
L
N
L
N
LOAD SYSTEM
LOAD SYSTEM
DISTRIBUTION
PANEL
DETAIL OF TERMINAL
10.40
13
EARTH
INPUT
Ring terminal
Cap
Input cable (Output cable)
60mm
(Wire cable)
Input cable
Wire protection(Accessory)
TB cover
Screw
TB cover(TOP)
Nut(Wire protection)
Output cable
Terminal
Summary of Contents for PEN102J1C
Page 8: ...1 1kVA 1 5kVA VII...
Page 9: ...VIII 2 4kVA...
Page 10: ...3kVA IX...
Page 11: ...Tower Type The attention label becomes it as follows 1kVA X...
Page 19: ......
Page 27: ...8 Figure 1 Need Space...
Page 84: ......
Page 85: ......