When opening the shipping package
The following items should have been packed in the box. Please open the box as soon as possible and
make sure all of the items were packed inside. Make sure there are no missing items. Make sure that none
of the items is damaged.
The housing for the measurement device and the load cell* were adjusted as a pair before delivery. They
have the same serial number on the red stickers attached to the both components
(
see the photos below
)
.
Make sure that the numbers on these stickers are the same.
*
LOAD CELL: Load cell means Strain Gauge Transducer.
Location of the serial number
□
Measurement device housing
(
Serial No.
)
□
Load cell
(
Serial No.
)
□
Instruction manual
●
If you ordered optional items :
□
Load measurement complete sensor
□
Evaluation mechanism parts
Load cell
□
Others
(
)
Back of the measurement
device housing
TABLE OF CONTENTS
PAGE
Name and function of each part on the measurement device housing ...................................1
Operating chart ........................................................................................................................4
External connection terminals and their functions .................................................................7
Connection examples ..............................................................................................................10
Connection procedures ...........................................................................................................12
Entering and changing each setting using the membrane switches .....................................13
Prohibiting changes ...........................................................................................................15
Changing and storing upper and lower comparison values ..............................................17
Method for selecting a pair of upper and lower limits ....................................................20
Setting the power supply frequency .................................................................................20
Method for selecting the measurement mode ...................................................................22
Maintenance ...........................................................................................................................24
Installation precautions
If a malfunction occurs
Wiring checks
Checking the location of the load measurement complete sensor
Troubleshooting ......................................................................................................................25
CHECK MAN and load cell specifications ..........................................................................27
Measurement device dimension drawings ............................................................................28
Load cell measurement drawings ..........................................................................................28
Circuit examples for connecting a timer box .......................................................................30
Summary of Contents for CHECK MAN CM-5
Page 31: ...27...