
SUPER RUNNER SERIES GAS FRYERS
CHAPTER 1: INSTALLATION INSTRUCTIONS
1-5
Frypot Assembly
Gas Valve
Manifold Support Bracket
Gas Burner
See Detail A
Pressure
Test
Spigot
Orifice
Temperature
Control
Gas
Manifold
Assembly
1/2—3/4 Reducer
Bushing
Burner
Gas Manifold
Burner/Orifice Location
Detail A
Orifice
1.30-inch [33-mm]
1.63-inch [41-mm]
1.6 Gas Conversion Components
Use the following components to convert from natural gas to propane and vice-
versa. See Section 1.5 for orifice quantities required for conversion.
Natural Gas to Propane Kits
SR42 - 8261817
SR52 - 8262018
SR62 - 8262020
Propane to Natural Gas Kits
SR42 - 8262017
SR52 - 8262019
SR62 - 8262021
Bushing, NPT Flush, SR 42 series only
Bushing, NPT Flush, SR 42 series only
Pilot Orifice (16LP)
Pilot Orifice (26N)
Burner Orifice, 1.51mm (#53)-
SR52 & SR62 Series Only
Burner Orifice, 2.53mm (#39)-
SR52 & SR62 Series Only
Burner Orifice, 1.70mm (#51)-
SR42 Series Only
Burner Orifice, 2.80mm (#35)-
S42 Series Only
* Burner orifices listed above are for fryers operating at altitudes of 2000 feet (610 meters) or less. For altitudes
greater than 2000 feet (610 meters), contact the factory for the correct orifice size.
Typical gas valve, burner and orifice locations (SR42 shown above).
Propane Applications:
Proper Regulator Must Be Installed
Regulator
Propane Applications:
Proper Regulator Must Be
Installed
Summary of Contents for Dean Super Runner Series
Page 3: ...Register Your Warranty Online at http fm hal frymaster com qsys lib cgi lib swr290 pgm ENGLISH...
Page 11: ...SUPER RUNNER SERIES GAS FRYERS CHAPTER 2 OPERATION 2 3 2 5 Wiring Diagram ENGLISH...
Page 12: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 15: ...Registre su garant a en l nea en http fm hal frymaster com qsys lib cgi lib swr290 pgm ESPA OL...
Page 23: ...FREIDORAS DE GAS SERIE SUPER RUNNER CAP TULO 2 OPERACI N 2 3 2 5 Diagrama de cableado ESPA OL...
Page 24: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 35: ...FRITEUSES GAZ SUPER RUNNER CHAPITRE 2 MODE D EMPLOI 2 3 2 5 Diagramme de c blage FRAN AIS...