can be set here. Devices having higher priority are actuated first, and subsequently, if
there is still excess energy available, the other devices.
Load management
It is possible for up to four different load management rules to be defined. At the same
threshold values, the rules are activated in succession. For deactivation, this is done in
reverse; the I/O last switched on is the first to be switched off. In the case of different
thresholds, the I/O with the lowest threshold is switched on first, followed by the second
lowest, and so on.
I/Os controlled by the produced power are always prioritised over a battery and Ohmpi-
lot. That is to say that an I/O can switch on and result in the battery no longer being
charged or the Ohmpilot no longer being activated.
An I/O is activated or deactivated only after 60 seconds.
Control
-
Control is deactivated.
-
Control is effected by the power generated.
-
Control is effected by excess power (given feed limits). This option can only be
selected if a meter has been connected. Control via Energy Manager is effected
using the actual power of feeding in with respect to the grid.
Thresholds
-
On: For entering an effective power limit, at which the output is activated.
-
Off: For entering an effective power limit, at which the output is deactivated.
Runtimes
-
Field for enabling a minimum duration for which the output is to be activated for each
switch-on process.
-
Field for enabling the maximum runtime per day.
-
Field for enabling a target duration for which the output is to be activated in total per
day (total of several switch-on processes).
98
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...