DC disconnector
The DC disconnector has three switch set-
tings:
(1)
Locked/off (turned to the left)
(2)
Off
(3)
On
IMPORTANT!
In switch settings (1) and (3), a conven-
tional padlock can be used to secure the
inverter against being switched on/off.
-
The national guidelines must be com-
plied with in this respect.
Data communica-
tion area
WSD
1
0
Modbus
GND
V+
M0-
M0+
SHIELD
SHIELD
M1-
M1+
GND
V+
RS485 (0/1)
F
ro
nius Smart Meter
,
Ohmpilot, Battery (only GEN24), Sunspec, Interface, ...
LAN 2
LAN 1
USB
(1A,5V)
Modbus 1
1
0
Modbus 0
1
0
Terminating resistor
LED
LED
WSD
IN+
IN-
OUT+
O
U
T-
WSD
> wired
disconnection
of
grid
feed-in
Factory
default
Terminating resistor
Only inverter
to inverter
communication
IP:
169.254.0.180
IOs
GND
GND
V+
V+
IO1
IO0
IO3
IO2
IO5*
IO4*
IN7*
IN6*
IN9*
IN8*
IN1
1
IN10
Load Management,
Demand Respone Mode (DRM)*,
Back-up power, IO control, ...
IO4 = RG0 (Ref GEN/0)
IO5 = CL0 (COM LOAD/0)
IN6 = 1/5
IN7 = 2/6
IN8 = 3/7
IN9 = 4/8
I/Os
* Demand Response Mode (DRM)
Frequency band: channel 1-11(2412-2462 MHz)
Radio-frequency power: <100 mW (<20 dBm)
Technical Data (WLAN)
IP WLAN:
192.168.250.181
| Password:
12345678
Modbus terminal
Push-in terminal for the installation of
Modbus 0, Modbus 1, 12 V and GND
(ground).
The data connection to the connected
components is established via the Mod-
bus terminal.
The inputs M0 and M1
can be selected for this purpose.
Max. 4 Modbus participants per input,
see chapter
on
page
.
WSD (wired shutdown) switch
Defines the inverter as a WSD master or
WSD slave.
Position 1:
WSD master
Position 0:
WSD slave
28
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...