inverter feeds energy into the grid at maximum 500 W and the operating status LED
flashes yellow.
The country setup can only be set when using the inverter for the first time. If the country
setup needs to be changed at a later date, please contact your installer / Technical Sup-
port team.
Button functions
and LED status
indicator
The status of the inverter is
shown via the operating status
LED. In the event of faults, carry
out the individual steps in the
Fronius Solar.web live app.
The optical sensor is actuated by
touching with a finger.
The status of the connection is
shown via the communication
LED. To establish the connection,
carry out the individual steps in
the Fronius Solar.web live app.
Sensor functions
1x = WLAN access point (AP) is opened.
Flashing blue
2x = WLAN Protected Setup (WPS) is activated.
Flashing green
3 seconds (max. 6 seconds) = the service notification is ter-
minated and the key lock is deactivated.
Lights up yellow
LED status indicator
The inverter is operating correctly.
Lights up green
The inverter starts.
Flashing green
The inverter is in standby, is not operational (e.g. no feed-in at
night) or is not configured.
Lights up yellow
87
EN
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...