Closing and commissioning the inverter
Closing the
inverter's con-
nection area/
housing cover,
and commission-
ing
NOTE!
The housing cover is fitted with a lock for safety reasons, which allows the hous-
ing cover on the inverter to be pivoted only when the DC disconnector is switched
off.
▶
Only clip and pivot the housing cover onto the inverter when the
DC disconnector
is switched off
.
▶
Do not use excessive force to clip in and pivot the housing cover.
1
Place the cover on the connection area.
Tighten the five screws by rotating them
180° to the right in the indicated order
using a screwdriver (TX20).
2
Clip the housing cover onto the inverter
from above.
Press on the lower part of the housing
cover and tighten the two screws 180° to
the right using a Torx screwdriver (TX20).
Turn on the automatic circuit breaker.
Turn the DC disconnector to the "On"
switch position. For systems with a battery,
observe the switch-on sequence according
to chapter
.
IMPORTANT!
The WLAN access point
(AP) will only then be activated by the DC
disconnector if the inverter is not con-
figured. Open WLAN access point with the
optical sensor, see chapter
tions and LED status indicator
on page
Starting the
inverter for the
first time
When using the inverter for the first time, various setup settings must be configured.
If the setup process is cancelled before the process is complete, any data that has been
input up to this point is lost and the start screen with the installation wizard is shown
again. If the process is interrupted, such as in the event of a power outage, the data is
saved. Commissioning may be continued from the point at which the process was inter-
rupted once the power supply has been restored. If the setup was interrupted, the
86
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...