Connecting the inverter to the public grid (AC side)
Safety
WARNING!
Danger due to incorrect operation and incorrectly performed work.
This can result in serious injury and damage to property.
▶
Read the Installation and Operating Instructions before installing and commissioning
the equipment.
▶
Only qualified personnel are authorised to commission your inverter and only within
the scope of the respective technical regulations.
WARNING!
Danger due to grid voltage and DC voltage from solar modules that are exposed to
light.
An electric shock can be fatal.
▶
Prior to any connection work, disconnect the inverter on the AC side and the DC
side.
▶
Only an authorised electrical engineer is permitted to connect this equipment to the
public grid.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and contamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
IMPORTANT!
National standards and guidelines regarding load unbalance must be taken into account.
The inverter does not have a communication link and does not automatically disconnect
from the grid when the load unbalance is exceeded.
If the inverter is installed in Australia or New Zealand (required standard:
AS4777.2:2015), the inverter must not be used as part of a three-phase combination, as
there is no communication link between the inverters.
Connecting the
inverter to the
public grid (AC
side)
NOTE!
The neutral conductor must be connected in order to operate the inverter.
It is not possible to operate the inverter in unearthed grids, such as IT grids (insulated
grids without ground conductor).
▶
Make sure that the grid's neutral conductor is grounded.
IMPORTANT!
The ground conductor of the AC cable must be laid in such a way that it is
the last to be disconnected in the event that the strain-relief device should fail.
This can be ensured by making it somewhat longer and by laying it in a loop.
58
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...