
The following points regarding cabling must be considered:
-
The main contacts of contactors K1 and K2 must be installed between the Fronius
Smart Meter and the residual current circuit breaker of the inverter and the residual
current circuit breaker of the backup power circuits.
-
The supply voltage for contactors K1 and K2 is provided by the public grid and must
be connected to phase 1 (L1) after the Fronius Smart Meter and fused accordingly.
-
Actuation of contactors K1 and K2 is carried out by the external grid and system pro-
tection unit.
-
The external grid and system protection unit must be installed after the Fronius
Smart Meter. Precise installation and wiring instructions for the external grid and
system protection unit can be found in its separate Operating Instructions.
-
The remote trip input of the external grid and system protection unit must be set to
NC according to the manufacturer's Operating Instructions.
-
To ensure residual current circuit breakers function in backup power mode, the con-
nection between the neutral conductor and the ground conductor must be estab-
lished as close as possible to the inverter, but in any case before the first residual
current circuit breaker. An NC contact is used for this purpose for the main contacts
of contactors K4 and K5. This ensures that the ground connection is established as
soon as the public grid connection is no longer available.
-
The supply voltage for contactors K1, K2, K4 and K5 is provided via phase 1 (L1) of
the public grid and is switched via the external grid and system protection unit.
-
An NC contact for relay K3, which activates the remote input of the external grid and
system protection unit, interrupts the supply voltage to contactors K1, K2, K4 and
K5. This prevents the ground connection from being immediately disconnected
again when power returns to the public grid and the backup power network of the
inverter from being switched to the public grid.
-
The NO contact of relay K3 gives additional feedback to the inverter on whether the
locking was successfully performed by relay K3.
-
Additional inverters or other AC sources can be installed in the backup power circuit
after the main contacts of K1 and K2. The sources are not synchronised to the net-
work of the inverter because this backup power network has a frequency of 53 Hz.
Testing backup
power mode
Backup power mode should be tested once it has been installed and set up for the first
time. A battery state of charge of over 30% is recommended when in test mode.
A description on how to run test mode can be found in the
(https://www.fronius.com/en/search-page, item number: 42,0426,0365).
79
EN
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...