General
Prerequisites for
backup power
mode
In order to use the inverter's backup power function, the following prerequisites must be
fulfilled:
-
The inverter must be from the Fronius GEN24 Plus device series.
-
A battery suitable for backup power use must be installed and configured.
-
Correct cabling of the backup power system in the electrical installation or usage of
a switch box from Enwitec (see chapter
Components for automatic Full Backup
on page
-
Mount and configure the Fronius Smart Meter at the feed-in point.
-
warning notice for the backup power supply
www.fronius.com/en/search-page, item number: 42,0409,0275) on the electrical dis-
tributor.
-
Apply the necessary settings in the "Devices and system components" → "Functions
and pins" → "Backup power" menu area and activate backup power.
-
Follow the
(https://www.fronius.com/en/search-page, item
number: 42,0426,0365) step by step and confirm.
Transitioning
from feeding
energy into the
grid to backup
power mode
1.
The public grid is monitored by the inverter's internal grid and system protection unit
and by the Fronius Smart Meter connected to it.
2.
The public grid fails or specific grid parameters are dropped below or
exceeded.
3.
The inverter carries out the measures necessary according to the country standard
and then switches off.
4.
The inverter starts backup power mode after a checking period.
5.
All loads in the household that are in the backup power circuit are supplied by the
battery and the PV modules. The remaining loads are not supplied with power and
are safely isolated.
Transitioning
from backup
power mode to
feeding energy
into the grid
1.
The inverter is operating in backup power mode.
2.
The public grid is functioning correctly again.
3.
The Fronius Smart Meter monitors the grid parameters on the public grid and
passes this information to the inverter.
4.
The stability of the returned public grid is determined by checking the measured val-
ues of the Fronius Smart Meter.
5.
The inverter ends backup power mode.
6.
All circuits are reconnected to the public grid and are supplied by the grid.
7.
The inverter can start feeding energy into the grid again after performing the grid
checks required by the relevant standard.
Backup power
and energy sav-
ing mode
Under the following conditions, the battery and the inverter are switched to energy saving
mode after a waiting time of 8 - 12 minutes and backup power mode is ended:
-
The battery is discharged to the minimum state of charge and no energy is coming
from the PV modules.
-
The inverter is set to energy saving mode (standby mode).
If the battery and inverter are in energy saving mode, the system is reactivated by the
following:
-
Enough energy is available from the solar modules.
-
The public grid is functioning again.
-
The battery is switched off and on.
37
EN
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...