Connecting backup power - PV Point (OP)
Safety
IMPORTANT!
The valid national laws, standards and provisions, as well as the specifications of the rel-
evant grid operator are to be taken into account and applied.
It is highly recommended that the specific installation be agreed with the grid operator
and explicitly approved by this operator. This obligation applies to system constructors in
particular (e.g. installers).
NOTE!
The continuous supply via the PV Point depends on the available PV power.
If the solar modules are not supplying enough power, interruptions may occur.
▶
Do not connect any loads that require an interruption-free supply.
WARNING!
Danger from incorrect installation, commissioning, operation or incorrect use.
This can result in severe personal injury/damage to property.
▶
Only trained and qualified personnel are authorised to install and commission the
system, and only within the scope of the technical regulations.
▶
The Installation and Operating Instructions must be read carefully prior to use.
▶
If anything is unclear, contact your vendor immediately.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and contamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
Installation
NOTE!
All loads that have to be supplied via the OP terminal must be protected by means
of a residual current circuit breaker.
In order to ensure the residual current circuit breaker operates properly, a connection
must be established between the neutral conductor N' (OP) and the earth.
For the Circuit Diagram recommended by Fronius, see
Circuit Diagram - PV Point (OP)
on page
70
Summary of Contents for Primo GEN24 3.0 Plus
Page 2: ......
Page 11: ...General information 11...
Page 12: ...12...
Page 31: ...Backup power variant PV Point OP 31...
Page 32: ...32...
Page 34: ...34...
Page 35: ...Backup power variant Full Backup 35...
Page 36: ...36...
Page 43: ...Installation 43...
Page 44: ...44...
Page 50: ...Do not install the inverter on the ceiling 50...
Page 84: ...84...
Page 90: ...90...
Page 91: ...Settings website of the inverter 91...
Page 92: ...92...
Page 110: ...I O power man agement settings 4 relays 110...
Page 112: ...I O power man agement settings 3 relays 112...
Page 114: ...I O power man agement settings 2 relays 114...
Page 118: ...118...
Page 119: ...Options 119...
Page 120: ...120...
Page 129: ...Appendix 129...
Page 130: ...130...
Page 143: ...Circuit diagrams 143...
Page 144: ...144...
Page 145: ...Circuit Diagram PV Point OP Circuit Diagram 145 EN...
Page 146: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 146...
Page 147: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 147 EN...
Page 148: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 148...
Page 149: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 149 EN...
Page 150: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 150...
Page 151: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 151 EN...
Page 153: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 153 EN...
Page 154: ...Wiring diagram surge protective device SPD Circuit Diagram 154...
Page 155: ...Dimensions of the inverter 155...
Page 156: ...156...
Page 157: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 157 EN...
Page 158: ...158...
Page 159: ...159 EN...