![Fronius Acerios Operating Instructions Manual Download Page 36](http://html1.mh-extra.com/html/fronius/acerios/acerios_operating-instructions-manual_2339066036.webp)
1
Anchor the upright console to the surface
2
Fit the cooling unit on the upright console
IMPORTANT!
To mount the cooling unit, follow the "FK 9000 R in Conjunc-
tion with a Power Source" chapter in the Operating Instructions for the cool-
ing unit.
3
Connect and secure the plasma power source to the cooling unit
4
Set up the plasma torch (on the robot, for example)
5
Connect the plasma torch to the plasma power source and the cooling unit
6
Connect the plasma torch to the external gas regulator
7
Use a LocalNet cable to join the external gas regulator to the plasma power
source
8
Connect the process gas supply to the external gas regulator
IMPORTANT!
A flow controller must not be fitted upstream of the external
gas regulator.
9
Connect the robot interface to the robot control system
10
Equip the plasma torch with the correct wearing parts
NOTE!
Do not use pure tungsten electrodes for the Acerios plasma power source (color
code: green).
36
Summary of Contents for Acerios
Page 1: ...Operating instructions Acerios 42 0426 0326 EA 003 21032022 EN US Operating instructions...
Page 2: ......
Page 17: ...General information 17...
Page 18: ...18...
Page 21: ...Operating controls and connec tions 21...
Page 22: ...22...
Page 30: ...30...
Page 31: ...Installation and Startup 31...
Page 32: ...32...
Page 38: ...38...
Page 39: ...Plasma Surface Treatment 39...
Page 40: ...40...
Page 53: ...Setup Settings 53...
Page 54: ...54...
Page 68: ...68...
Page 69: ...Troubleshooting and Maintenance 69...
Page 70: ...70...
Page 79: ...Appendix 79...
Page 80: ...80...
Page 82: ...82...
Page 83: ...83 EN US...