9 - ENGLISH
•
If needed, carry out an equipotential bonding,
using the screw placed on the rear of the machine
below the frame and marked with the symbol
shown to the left.
•
Make sure that the cold water supply line intended
for condensation has pressure values between 1
and 3 BAR and temperature between 13° and
20°C.
•
Connect the cold water supply pipe intended for
condensation onto the machine inlet as shown in
the figure. Use a Ø1/2” fitting and place a gate
valve in the operator's reach.
•
Connect the condensation water drain pipe onto
the machine outlet as shown in the figure, using a
Ø1/2” fitting.
•
Always use new pipes suitable for hot water and
for pressure up to 10 bar both for delivery and
draining. Never use worn or consumed piping. Use
suitable DIN 3017 hose clamps.
•
The drain pipe must have an inclination of at least
3 cm for each meter of length.
•
After having connected the water inlet and outlet
pipes, with the machine stopped, open the cut-off
cock and make sure that water does not leak from
the drain.
•
Turn off the master switch and press the
AUTOMATIC button on the batch freezer control
panel to check the following:
1. Motor rotation direction.
The machine is equipped with a sophisticated
electronic system which is able to automatically
detect if the beater motor rotation direction of
the batch freezer is the correct one (anti-
clockwise).
If the phases are inverted in the plug, after a
few seconds of operating in production mode,
the machine stops and the display shows the
relative alarm message. To connect the phases
properly cut the power and invert the two phase
wires in the plug.
Summary of Contents for AGG.2014 Series
Page 1: ...USE AND MAINTENANCE MANUAL Series AGG 2014 C 136 04 C137 04 C138 04 ...
Page 61: ...ENGLISH 60 ...
Page 63: ...APPENDICI 2 9 2 Refrigerant circuit diagram ...
Page 66: ...5 APPENDICI C136 37 38 s04 Tav 1 ...
Page 68: ...7 APPENDICI C136 37 38 s04 OPTIONAL Tav 2 ...
Page 70: ...9 APPENDICI C136 37 38 s04 Tav 3 ...
Page 72: ...11 APPENDICI C136 37 38 s04 Tav 4 ...
Page 74: ...13 APPENDICI C136 37 38 s04 400 50 3 Tav 5 ...
Page 76: ...15 APPENDICI C136 37 38 s04 220 60 3 Tav 6 ...
Page 78: ...17 APPENDICI C136 37 38 s04 Tav 7 ...
Page 80: ...19 APPENDICI C136 37 38 s04 Tav 8 ...
Page 82: ...21 APPENDICI C138 s04 Tav 9 ...
Page 84: ...23 APPENDICI C136 C137 s04 Tav 10 ...
Page 86: ...25 APPENDICI C136 37 38 s04 Tav 11 ...
Page 88: ...27 APPENDICI C136 37 38 s04 Tav 12 ...
Page 90: ...29 APPENDICI C136 37 38 s04 400 50 3 Tav 13 ...
Page 92: ...31 APPENDICI C136 37 38 s04 220 60 3 Tav 14 ...
Page 94: ...NOTE NOTES NOTES BEMERKUNG NOTA ...
Page 95: ......