MAINTENANCE PROCEDURES
22
Fluid Management
®
MAINTENANCE
PROCEDURES
To ensure safe, dependable operation of the paint mixer, follow the
maintenance schedule detailed below:
WEEKLY
Lubricate the following items with SAE 20 oil:
•
Top pressure plate nut (accessed through the right and left side
doors)
•
Threaded lead screw (accessed through the front door)
EVERY 3 MONTHS
Lubricate the Super-Struts with SAE 20 oil:
•
Apply oil to the Super-Strut pins so that the oil will flow down
the bushing.
•
Lubricate the struts on the both sides of the mixer.