
Performance Verification
3.5 Input A and Input B Tests
3
3-23
ST8129.WMF
Figure 3-8. Test Tool Input A-B to 5500A Normal Output for >300V
2.
Select the following test tool setup:
•
Press
to select auto ranging (
AUTO
in top of display).
Do not press
anymore!
•
Press
to open the INPUT A MEASUREMENTS menu, and choose:
MEASURE on A:
Vac
•
Press
to open the INPUT A MEASUREMENTS menu, and choose:
MEASURE on A:
Vdc
(Vdc becomes main reading, Vac secondary reading)
•
Press
to open the INPUT B MEASUREMENTS menu, and choose:
INPUT
B:
ON | MEASURE on B:
Vac
•
Press
to open the INPUT B MEASUREMENTS menu, and choose:
INPUT
B:
ON | MEASURE on B:
Vdc
•
Move the Input A and Input B ground level (indicated by zero icon
) to the center
grid line. Proceed as follows:
⇒
Press
to enable the arrow keys for moving the Input A ground level.
⇒
Press
to enable the arrow keys for moving the Input B ground level.
⇒
Using the
keys move the ground level.
3.
Using
set the Input A and B sensitivity to the first test point in Table 3-7.
The corresponding range is shown in the second column of the table.
4.
Set the 5500A to source the required AC voltage (NORMAL output, WAVE sine). Set
the 5500A to Operate (OPR).
5.
Observe the Input A and B main reading (V-dc) and secondary reading (V-ac) and check
to see if it is within the range shown under the appropriate column.
6.
Continue through the test points.
Summary of Contents for ScopeMeter 123
Page 6: ......
Page 12: ......
Page 16: ......
Page 30: ...Fluke 123 124 125 Service Manual 2 16...
Page 32: ......
Page 62: ......
Page 64: ......
Page 80: ......
Page 82: ...Fluke 123 124 125 Service Manual 5 4 ST8014 EPS Figure 5 1 Fluke 123 124 125 Main Assembly...
Page 88: ...Fluke 123 124 125 Service Manual 5 10...
Page 90: ......