Section 2 - Pump operation
15 Pump controls and interface
16 Switching the pump on for the first time
16.3 Enable United States Food and Drug Administration (FDA) 21CFR Part
11 Compliance
16.5 Setting the filling method
16.6 Setting the pump administrator
17 Switching the pump on after initial setup
18.2 Enter the username if FDA 21CFR Part 11 compliance is enabled
PF7/PF7+ Peristaltic Filler with QC14 Pumphead User Manual
35
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN