Installation Instructions
Page 64 Panda 14.000 NE PVK-U S00420 - Chapter E: Installation Instructions
E.2 AC-Control box
In the AC-Control box the needed capacitors for the excitation of the generator are placed as well
as the electronic control for voltage/speed regulation VCS and the starting current reinforcement
ASB. The AC-Control box must be connected with the conductions (high voltage and low-voltage)
to the generator.
The front panel must always be closed, since the AC-Control box produces 400V during
operation.
1
3
2
4
3
1. Terminal block for excitation cable
2. VCS-printed board
3. Excitation capacitors (6x60µF)
5. Booster capacitor (3x40µF)
Summary of Contents for Panda 14.000 NE PVK-U
Page 1: ...Generator type Panda 14 000 NE PVK U 400V 50 Hz 12kW Icemaster Fischer Panda...
Page 28: ...The Panda Generator Page 24 Panda 14 000 NE PVK U S00420 Chapter A The Panda Generator...
Page 62: ...Generator Failure Page 58 Panda 14 000 NE PVK U S00420 Chapter D Generator Failure...
Page 92: ...Appendix Page VIII Panda 14 000 NE PVK U S00420 Chapter F Appendix...
Page 94: ...Measurements Page X Panda 14 000 NE PVK U S00420 Chapter F Appendix F 7 Measurements...
Page 96: ...Wiring diagram control panel Page XII Panda 14 000 NE PVK U S00420 Chapter F Appendix...