Mounting
The
pump
skid
is
constructed
with
the
following
features
that
enable
it
to
be
easily
maneuvered
to
its
final
installation
location
and
secured
in
place.
1.
The
skid
is
equipped
with
fork
lift
slots
at
each
end
of
the
skid
to
allow
it
to
be
easily
lifted
using
a
standard
forklift
with
adjustable
forks.
See
Figure
41.
2.
Two
lifting
eyes
are
provided
at
each
end
of
the
skid
to
allow
it
to
be
lifted
using
lifting
devices
such
as
a
crane
or
hoist.
See
Figure
41.
3.
Optional
rolling
casters
(P/N
02
‐
15334)
can
be
ordered
and
mounted
to
the
skid
in
the
field
to
allow
the
unit
to
be
rolled
into
its
mounting
location.
See
Figure
42.
Figure
41:
Pump
Skid
Lifting
and
Mounting
Points
Figure
42:
Pump
Skid
with
Casters
Installed
Pump
skid
unit
shall
be
installed
and
anchored
on
a
suitable
foundation
(provided
by
others)
using
the
four
mounting
holes
provided
on
the
pump
skid.
See
Figure
41.
Pump
skid
unit
must
be
leveled
and
piping
connection
locations
verified
prior
to
installation
of
the
skid
to
ensure
piping
mates
up
with
the
pump
flanges
without
strain.