background image

FAST & FLUID MANAGEMENT srl 

A Unit of Idex Corporation

 

 

 

 

 

 

 

8

 

 

 

10.3. CAN CLAMPING 

 
The ‘Can clamping’ function keeps the can blocked while the machine is shaking. 
A motor guarantees the continuous clamping on the can, which is controlled by a dedicated sensor. 
The clamping force is set in the factory during the final test on each shaker; in any case, the force can be 
modified by a technician (through the Operator Panel) according to the needs/requirement of the customer. 
 
Default values are: 

-

 

Bigger cans (up to 35Kg) 

= 350 Kg clamping force 

-

 

Smaller cans (up to 10Kg)  = 250 Kg clamping force 

SO300 shaker has another sensor, which recognizes the size of the can in the inner shaking frame (bigger 
or smaller can); according to that, the correct clamping pressure (1 or 2) is automatically chosen by the 
machine itself. 
If, while the machine is shaking, the above-mentioned sensor cannot detect the can anymore, the shaking 
cycle is stopped and a warning noise is uttered. 
 

10.4. CAN SHAKING 

 
The shaking cycle starts by pressing one of the three buttons T1, T2, T3, which have 3 pre-set values with 
different shaking times (1, 2 or 3 minutes, by default). 
Also these 3 parameters have been pre-set in the testing phase (in the factory); in any case they can be 
modified by a technician (through the Operator Panel) according to the needs/requirement of the customer, 
previous consent of Fast & Fluid Management. 
 
Shaking: after pressing button T1 (or T2 or T3) the upper plate lowers till it touches the can. After the sensor 
has ascertained that the can is well clamped, the shaking starts. 
At the end of the shaking, the upper plate goes up for about 4 second, and then stops. 
Shaking can be stopped any time by pressing button Stop/Up, or the emergency button. 
In this moment door can be opened and the can may be removed. 
 

When shaking cycle is finished, please remember not to leave the can inside the machine. 

 

 

11. LOADING THE CAN INTO THE MACHINE

 

 

 

 

 

 

 

 

Place the rubber 
disk onto the can lid 

 

Fix the can handle 
with the rubber band 
provided 

 

Make sure that the 
can is centered onto 
the lower plate 

 

It is possible to 
shake several cans 
with the same 
height by using an 
adaptor  

 

 

 

 

12. ACOUSTIC WARNINGS 

 

All operations are monitored by the resident program of the machine and in case of malfunctioning or at the 
end  of  the  shaking  cycle,  the  machine  gives  out  a  warning  sound.  In  case  of  malfunctioning  the  machine 
immediately stops. 
Here follow some examples of malfunctioning/warnings: 

Summary of Contents for SO-300

Page 1: ...nit of Idex Corporation Shaker SO 300 USER MANUAL FAST FLUID MANAGEMENT Srl A Unit of IDEX Corporation Via Pelizza da Volpedo n 109 111 20092 Cinisello Balsamo MI ITALY Tel 39 02 66091 1 Fax 39 02 660...

Page 2: ...ARRANTY TERMS AND CONDITIONS 3 5 GENERAL DESCRIPTION 3 6 SAFETY RULES 3 7 RESIDUAL RISKS 5 8 INSTALLATION REQUIREMENTS 6 9 KEYBOARD 7 10 HOW TO OPERATE 7 11 LOADING THE CAN INTO THE MACHINE 8 12 ACOUS...

Page 3: ...not give any allowance for reproducing or using this manual for other than installation use or maintenance No part of this manual can be reproduced translated or filed neither on computer in any form...

Page 4: ...ts to the machine without written approval and or by unauthorized staff in case of incomplete maintenance or failure to observe the instructions contained in this manual The above conditions are appli...

Page 5: ...SO300 tools after servicing 5 Make sure the environment in which the machine is installed complies with the laws in force you need to have an authorization issued by the Fire Brigade or by the compete...

Page 6: ...tection protective glasses protective shoes protective gloves especially during the loading and unloading of the cans 7 4 General danger situations There is not any particular hazardous situation e g...

Page 7: ...tal conditions must be within the following limits Air temperature 10 to 40 C Relative humidity 30 to 90 During the installation it is advisable to use protective gloves to avoid injuries Connect the...

Page 8: ...T3 shaking cycle activated CLAMP OK Green Led ON Machine is clamping the can Button Stop Up Stop shaking open plate Reset after emergency stop Emergency button 10 HOW TO OPERATE 10 1 SWITCHING SO300 O...

Page 9: ...efault Also these 3 parameters have been pre set in the testing phase in the factory in any case they can be modified by a technician through the Operator Panel according to the needs requirement of t...

Page 10: ...sor activated Stand by No precaution Door closed 14 MAINTENANCE AND CLEANING During maintenance and check operations please wear protection gloves and unplug the machine These operations must be carri...

Page 11: ...se any non abrasive cleaning product for domestic use on washable surfaces Control panel keyboard Use a wet cloth The use of neutral soap is allowed Then wipe no rinse with a dry cloth or a paper towe...

Page 12: ...ttons T1 T2 T3 Before the shaking starts press Stop Up Open the door Unplug the machine from the mains Remove the grease and possible dried paint see paragraph 12 3 Then put some grease with a brush o...

Page 13: ...anel board Uni directional AC motor drive Shaker motor Digital inputs Can sensors DC Solenoid drive Door solenoid Logic board Bi directional Pwm motor drive Clamp motor Digital inputs Upper limit swit...

Page 14: ...1 P O Box 220 2170AE SASSENHEIM 1 01 Revnr Sheet Title Date Drawn Remarks Filename FAST FLUID MANAGEMENT Version RED GREEN 1 3 BROWN WHITE BROWN BLUE BROWN BLUE 1 2 BROWN WHITE 1 BLUE BROWN 20V GREY 0...

Page 15: ...FAST FLUID MANAGEMENT srl A Unit of Idex Corporation 14...

Reviews: