background image

FAST & FLUID MANAGEMENT srl 

A Unit of Idex Corporation

 

 

 

 

 

 

 

4

 

 

Power supply 

 

à

 230-240 VOLTAGE: power supply with a magneto-thermal protection device that intervenes when current absorbed 

exceeds 16 Amps or for leakage current of 30 mAmps, according to local regulations. 

à

  115  VOLTAGE:  power  supply  with  a  magneto-thermal  protection  device  that  intervenes  when  current  absorbed 

exceeds 25 Amps or for leakage current of 30 mAmps, according to local regulations. 

 

 

ELECTRICAL WIRING CAN BE ACCESSED BY QUALIFIED PERSONNEL ONLY. 

DO NO OPERATE THE MACHINE IF THE SIDE OR REAR PANELS ARE NOT ASSEMBLED.

 

 

 

Safe use of the machine 

 

The producer shall take the all possible care in planning, designing, the checking the installation and the start up of the 
machine to guarantee the maximum operational level during a rational use of the system supplied. 
All components must be in accordance with the current safety regulations. Up to date safety systems are installed in the 
machine to ensure the best protection available at the moment. 
While using SO300 you must keep to the following safety rules:

 

The “end-user” must keep to the safety regulations of the country where the machine is installed. If there is a 
conflict between European regulation and local regulation, the most severe rule will apply on the specific 
issue. 

Installation and maintenance of SO300 shaker must be carried out by a qualified technician

 

Safety rules when the machine is operating  

 

1.  To avoid injuries, all panels of the body of the machine must be assembled and correctly fixed to the frame. 
2.  Do not tamper the protective control system and the door locking device. 
3.  Before  any  inspection  and  maintenance  operation  on  SO300,  disconnect  it  from  the  mains  outlet  to  avoid 

unexpected starts. 

4.  Do not leave inside the SO300 tools after servicing  
5.  Make sure the environment in which the machine is installed complies with the laws in force (you need to have an 

authorization  issued  by  the  Fire  Brigade  or  by  the  competent  authority)  and  avoid  a  dangerous  massing  of  paint 
cans. It is forbidden to store flammable materials or other materials inside the machine. Using naked flames, white –
hot objects or any device that might generate sparks in the room where the machine is placed. 

6.   It is advisable to install a ventilation system, to guarantee that close to the machine the vapor dilution is lower than 

30% 

7.  When work is finished, do not leave the can(s) inside the machine and do not leave the machine switched on. 
8.  In the premises where the SO300 is installed, within a 5 meter range from the machine, there must be a plate with 

the writing “Smocking is strictly forbidden”. 

 

 

SO300 shaker must not be installed in an working area classified as EX 

 

 
 

WARNING! 

Avoid operating the SO300 if it is not loaded with a can. 

Never use a load with a weight over 35 Kg. 

Remove all cans inside the machine before switching it off. 

Do not place any

 damaged can

 inside the SO300. Consequent rupture during mixing may cause damage to 

the shaker. Running the SO300 with damaged packaging is at User's risk.

 

Already damaged cans may cause damage to the your machine.

 

During the maintenance follow the security rules and the procedure described in this paragraph. 

The SO300 is to be operated only by trained personnel. FAST & FLUID MANAGEMENT THE 

NETHERLANDS shall not be liable for any damage or injury caused by non-compliance with the "user" and 

"safety" regulations presented in this manual, or by not taking the usual and accepted precautions in 

handling, operating or repairing, even if not expressly stated in this manual. 

This is also valid for damage and/or accidents as a result of changes made to the machine that are 

implemented without prior notice to and approval by FAST & FLUID MANAGEMENT THE NETHERLANDS.

 

 

 

 
 

Summary of Contents for SO-300

Page 1: ...nit of Idex Corporation Shaker SO 300 USER MANUAL FAST FLUID MANAGEMENT Srl A Unit of IDEX Corporation Via Pelizza da Volpedo n 109 111 20092 Cinisello Balsamo MI ITALY Tel 39 02 66091 1 Fax 39 02 660...

Page 2: ...ARRANTY TERMS AND CONDITIONS 3 5 GENERAL DESCRIPTION 3 6 SAFETY RULES 3 7 RESIDUAL RISKS 5 8 INSTALLATION REQUIREMENTS 6 9 KEYBOARD 7 10 HOW TO OPERATE 7 11 LOADING THE CAN INTO THE MACHINE 8 12 ACOUS...

Page 3: ...not give any allowance for reproducing or using this manual for other than installation use or maintenance No part of this manual can be reproduced translated or filed neither on computer in any form...

Page 4: ...ts to the machine without written approval and or by unauthorized staff in case of incomplete maintenance or failure to observe the instructions contained in this manual The above conditions are appli...

Page 5: ...SO300 tools after servicing 5 Make sure the environment in which the machine is installed complies with the laws in force you need to have an authorization issued by the Fire Brigade or by the compete...

Page 6: ...tection protective glasses protective shoes protective gloves especially during the loading and unloading of the cans 7 4 General danger situations There is not any particular hazardous situation e g...

Page 7: ...tal conditions must be within the following limits Air temperature 10 to 40 C Relative humidity 30 to 90 During the installation it is advisable to use protective gloves to avoid injuries Connect the...

Page 8: ...T3 shaking cycle activated CLAMP OK Green Led ON Machine is clamping the can Button Stop Up Stop shaking open plate Reset after emergency stop Emergency button 10 HOW TO OPERATE 10 1 SWITCHING SO300 O...

Page 9: ...efault Also these 3 parameters have been pre set in the testing phase in the factory in any case they can be modified by a technician through the Operator Panel according to the needs requirement of t...

Page 10: ...sor activated Stand by No precaution Door closed 14 MAINTENANCE AND CLEANING During maintenance and check operations please wear protection gloves and unplug the machine These operations must be carri...

Page 11: ...se any non abrasive cleaning product for domestic use on washable surfaces Control panel keyboard Use a wet cloth The use of neutral soap is allowed Then wipe no rinse with a dry cloth or a paper towe...

Page 12: ...ttons T1 T2 T3 Before the shaking starts press Stop Up Open the door Unplug the machine from the mains Remove the grease and possible dried paint see paragraph 12 3 Then put some grease with a brush o...

Page 13: ...anel board Uni directional AC motor drive Shaker motor Digital inputs Can sensors DC Solenoid drive Door solenoid Logic board Bi directional Pwm motor drive Clamp motor Digital inputs Upper limit swit...

Page 14: ...1 P O Box 220 2170AE SASSENHEIM 1 01 Revnr Sheet Title Date Drawn Remarks Filename FAST FLUID MANAGEMENT Version RED GREEN 1 3 BROWN WHITE BROWN BLUE BROWN BLUE 1 2 BROWN WHITE 1 BLUE BROWN 20V GREY 0...

Page 15: ...FAST FLUID MANAGEMENT srl A Unit of Idex Corporation 14...

Reviews: