background image

5

5

4

4

3

3

2

2

1

1

D

D

C

C

B

B

A

A

1813167

1813168

1813169

1813172

1813173

1813171

1813170

GND

KEYBOARD

PO
W

ERBOARD

SO
300

M

GND

GND

GND

25uF

80uF

START

RUN

filt
er

1813166

J4

J5

J6

J7

J8

J2

J9

J3

J

10

J

1a

J1

1863358

T

hursda

y

, June 02, 2005

1

9

SO300

0

23-3-

2005

NvB

 

1st version

Changed 

m

otor 

w

ire colors, added J-nu

m

bers

 

 

 

 

SO300

 

 

 

 

 

 

 

 

NvB

 

 

 

 

 

2-6-2

005

1.01

 

 

© 2002 

F

luid 

M

anage

m

ent

Hub van Doorne

w

eg 31

P.O.Box 220

2170AE SASSENHEIM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.01

Revnr.

Sheet

T

itle

Date

Dra

wn

Re
m

ar

ks

F

ilena

me

FAST & FLUID

MANAGEMENT

Version

RED

GREEN

1

3

BROWN

WHITE

BRO

WN

BLUE

BRO

WN

BLUE

1

2

BRO

WN

W
HI
TE

1

BLUE

BRO

WN

20
V
GREY

0

BLACK

6V

Y

ELLOW

0

BLUE

230V

BRO

WN

0

W
HI
TE

BRO

WN

BLUE

YEL/GRN

BLUE

RED

BLACK

Y

EL/GRN

BRO

WN

W
HI
T

E/BRO

WN

BLUE

Y

EL/GRN

4

BLACK

BRO

WN

4

BLACK

BRO

WN

BRO

WN

BLACK

GREY

3

BLACK

2

BRO

WN

BLACK

BLACK

2

BLACK

GREY

BROWN

GREY

1

2

M

MO

T

OR

C

L

AMP

SENSOR

SHAKE

-ENAB

LE

S1

SW

 DPNC

SENSOR

CANS

IZE

M

ICROSW

IT

CH
 NO

DOOR

IN

OU
T1

OU
T2

T

RANS

F

ORMER

M

ICROSW

IT

CH

C

L

AMPP

L

A

TE

SO
L

ENO

ID

DOOR

U1

NE
T

EN
T

RY
 w

.f

use

5

6

Summary of Contents for SO-300

Page 1: ...nit of Idex Corporation Shaker SO 300 USER MANUAL FAST FLUID MANAGEMENT Srl A Unit of IDEX Corporation Via Pelizza da Volpedo n 109 111 20092 Cinisello Balsamo MI ITALY Tel 39 02 66091 1 Fax 39 02 660...

Page 2: ...ARRANTY TERMS AND CONDITIONS 3 5 GENERAL DESCRIPTION 3 6 SAFETY RULES 3 7 RESIDUAL RISKS 5 8 INSTALLATION REQUIREMENTS 6 9 KEYBOARD 7 10 HOW TO OPERATE 7 11 LOADING THE CAN INTO THE MACHINE 8 12 ACOUS...

Page 3: ...not give any allowance for reproducing or using this manual for other than installation use or maintenance No part of this manual can be reproduced translated or filed neither on computer in any form...

Page 4: ...ts to the machine without written approval and or by unauthorized staff in case of incomplete maintenance or failure to observe the instructions contained in this manual The above conditions are appli...

Page 5: ...SO300 tools after servicing 5 Make sure the environment in which the machine is installed complies with the laws in force you need to have an authorization issued by the Fire Brigade or by the compete...

Page 6: ...tection protective glasses protective shoes protective gloves especially during the loading and unloading of the cans 7 4 General danger situations There is not any particular hazardous situation e g...

Page 7: ...tal conditions must be within the following limits Air temperature 10 to 40 C Relative humidity 30 to 90 During the installation it is advisable to use protective gloves to avoid injuries Connect the...

Page 8: ...T3 shaking cycle activated CLAMP OK Green Led ON Machine is clamping the can Button Stop Up Stop shaking open plate Reset after emergency stop Emergency button 10 HOW TO OPERATE 10 1 SWITCHING SO300 O...

Page 9: ...efault Also these 3 parameters have been pre set in the testing phase in the factory in any case they can be modified by a technician through the Operator Panel according to the needs requirement of t...

Page 10: ...sor activated Stand by No precaution Door closed 14 MAINTENANCE AND CLEANING During maintenance and check operations please wear protection gloves and unplug the machine These operations must be carri...

Page 11: ...se any non abrasive cleaning product for domestic use on washable surfaces Control panel keyboard Use a wet cloth The use of neutral soap is allowed Then wipe no rinse with a dry cloth or a paper towe...

Page 12: ...ttons T1 T2 T3 Before the shaking starts press Stop Up Open the door Unplug the machine from the mains Remove the grease and possible dried paint see paragraph 12 3 Then put some grease with a brush o...

Page 13: ...anel board Uni directional AC motor drive Shaker motor Digital inputs Can sensors DC Solenoid drive Door solenoid Logic board Bi directional Pwm motor drive Clamp motor Digital inputs Upper limit swit...

Page 14: ...1 P O Box 220 2170AE SASSENHEIM 1 01 Revnr Sheet Title Date Drawn Remarks Filename FAST FLUID MANAGEMENT Version RED GREEN 1 3 BROWN WHITE BROWN BLUE BROWN BLUE 1 2 BROWN WHITE 1 BLUE BROWN 20V GREY 0...

Page 15: ...FAST FLUID MANAGEMENT srl A Unit of Idex Corporation 14...

Reviews: