background image

FAST & FLUID MANAGEMENT srl 

A Unit of Idex Corporation

 

 

 

 

 

 

 

6

 

 

 

8. INSTALLATION REQUIREMENTS 

 

SO300 has to be placed on a level and stable ground. Please install the machine by proceeding as follows: 

à

 230-240 VOLTAGE: power supply with a magneto-thermal protection device that intervenes when current 

absorbed exceeds 16 Amps or for leakage current of 30 mAmps, according to local regulations. 

à

  115  VOLTAGE:  power  supply  with  a  magneto-thermal  protection  device  that  intervenes  when  current 

absorbed exceeds 25 Amps or for leakage current of 30 mAmps, according to local regulations. 

Environmental conditions must be within the following limits: 
 

Air temperature 

 

10 to 40 °C 

 

Relative humidity   

30 to 90 % 

During the installation it is advisable to use protective gloves to avoid injuries.

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Connect the power cable to the 

SO300 so that you can open 

the door 

 

Pull the cords fixed to the 

wooden blocks 

 

Before trying to start the 

machine, make sure the screws 

and the wooden blocks have 

been removed from the 

machine itself 

 
 
 
 
 
 
 
 
 
 
 
 
 

Undo the feet of the machine, till the machine 
wheels no longer touch the ground 

 

 

 

Block the feet by doing their 

respective lock nuts 

 

 

 

SO300 shaker must not be installed in an working area classified as EX 

 
 

Remove the bolts that fixe the machine to the pallet 

 

Remove the screws at the inside of 

the side panels 

Set the machine level by 

using an appropriate tool 

Summary of Contents for SO-300

Page 1: ...nit of Idex Corporation Shaker SO 300 USER MANUAL FAST FLUID MANAGEMENT Srl A Unit of IDEX Corporation Via Pelizza da Volpedo n 109 111 20092 Cinisello Balsamo MI ITALY Tel 39 02 66091 1 Fax 39 02 660...

Page 2: ...ARRANTY TERMS AND CONDITIONS 3 5 GENERAL DESCRIPTION 3 6 SAFETY RULES 3 7 RESIDUAL RISKS 5 8 INSTALLATION REQUIREMENTS 6 9 KEYBOARD 7 10 HOW TO OPERATE 7 11 LOADING THE CAN INTO THE MACHINE 8 12 ACOUS...

Page 3: ...not give any allowance for reproducing or using this manual for other than installation use or maintenance No part of this manual can be reproduced translated or filed neither on computer in any form...

Page 4: ...ts to the machine without written approval and or by unauthorized staff in case of incomplete maintenance or failure to observe the instructions contained in this manual The above conditions are appli...

Page 5: ...SO300 tools after servicing 5 Make sure the environment in which the machine is installed complies with the laws in force you need to have an authorization issued by the Fire Brigade or by the compete...

Page 6: ...tection protective glasses protective shoes protective gloves especially during the loading and unloading of the cans 7 4 General danger situations There is not any particular hazardous situation e g...

Page 7: ...tal conditions must be within the following limits Air temperature 10 to 40 C Relative humidity 30 to 90 During the installation it is advisable to use protective gloves to avoid injuries Connect the...

Page 8: ...T3 shaking cycle activated CLAMP OK Green Led ON Machine is clamping the can Button Stop Up Stop shaking open plate Reset after emergency stop Emergency button 10 HOW TO OPERATE 10 1 SWITCHING SO300 O...

Page 9: ...efault Also these 3 parameters have been pre set in the testing phase in the factory in any case they can be modified by a technician through the Operator Panel according to the needs requirement of t...

Page 10: ...sor activated Stand by No precaution Door closed 14 MAINTENANCE AND CLEANING During maintenance and check operations please wear protection gloves and unplug the machine These operations must be carri...

Page 11: ...se any non abrasive cleaning product for domestic use on washable surfaces Control panel keyboard Use a wet cloth The use of neutral soap is allowed Then wipe no rinse with a dry cloth or a paper towe...

Page 12: ...ttons T1 T2 T3 Before the shaking starts press Stop Up Open the door Unplug the machine from the mains Remove the grease and possible dried paint see paragraph 12 3 Then put some grease with a brush o...

Page 13: ...anel board Uni directional AC motor drive Shaker motor Digital inputs Can sensors DC Solenoid drive Door solenoid Logic board Bi directional Pwm motor drive Clamp motor Digital inputs Upper limit swit...

Page 14: ...1 P O Box 220 2170AE SASSENHEIM 1 01 Revnr Sheet Title Date Drawn Remarks Filename FAST FLUID MANAGEMENT Version RED GREEN 1 3 BROWN WHITE BROWN BLUE BROWN BLUE 1 2 BROWN WHITE 1 BLUE BROWN 20V GREY 0...

Page 15: ...FAST FLUID MANAGEMENT srl A Unit of Idex Corporation 14...

Reviews: