
MASTERSPLIT WP30
13
5. Attach the hook to the shaft or to the loader arm
being closest to the machine (at the position marked
with a label). (Make sure the strap remains loose.)
7. Carefully lower the shaft and make sure it is held by
the strap.
6. Loosen the shaft lock.
8. Use the winch to lower the shaft down to the lo-
west position and make sure the strap does not fray. If
the machine is equipped with the wood loader (extra
equipment), swivel the loader’s hook to the front, re-
move the cotter pin and turn the loader arms down-
wards (see section ”Wood loader”).
Summary of Contents for Mastersplit WP30
Page 40: ...MASTERSPLIT WP30 40 HYDRAULICS ...
Page 41: ...MASTERSPLIT WP30 41 ...
Page 44: ...MASTERSPLIT WP30 44 FRAME ...
Page 46: ...MASTERSPLIT WP30 46 TANK ...
Page 48: ...MASTERSPLIT WP30 48 CHAINSAW ...
Page 50: ...MASTERSPLIT WP30 50 CHAINSAW ...
Page 52: ...MASTERSPLIT WP30 52 WOOD SPLITTER ...
Page 54: ...MASTERSPLIT WP30 54 CONVEYOR ...
Page 56: ...MASTERSPLIT WP30 56 1 2 3 4 5 6 7 7 8 9 10 11 12 13 14 15 ELECTRIC ENGINE ...
Page 58: ...MASTERSPLIT WP30 58 1 2 3 4 5 6 7 8 9 10 11 12 13 COMBUSTION ENGINE ...
Page 67: ......