background image

WIRING DIAGRAM AND ACCESSORIES

Before  fitting Hindi 880-evo make sure the installation is pre-set for all the safety and control accessories as required.

  1 - Miri 4 flasher with aerial - code 4612L and code 4601L

  2 - Elpro 27 controller (installed in a protected and sheltered place) - code 7047L

        with VIX 53/2 R plug-in radio receiver - code 5311L

  3 - 230 V - 50 Hz - 0,03 A magneto-thermal differential circuit breaker (not supplied with the equipment)  

        (2,5 mm² cable section beyond 100 m)

  4 - Fit 55 recess photocell receiver - code 551L

  5 - Hindi 880-evo

  6 - Open position gate stop (compulsory, not supplied with the equipment)  

  7 - Electric lock: Hindi 880-evo non locking version and with gate leafs wider than 2,0 m 

  8 - Closed position gate stop (compulsory, not supplied with the equipment)

  9 - Fit 55 recess photocell transmitter  - code 551L

10 - 0,5 m post - code 555L

11 - Post fixing plate with cover - code 554L

12 - Chis 37 recess key-switch - code 371L

13 - VIX 53/4 TR - code 5313GL

230 V 50 Hz ±10%

4x1 mm²

4x1,5 mm²

2x1 mm²

4x1 mm²

2x1 mm²

2x1 mm²

RG58

1

2x1 mm²

2

3

4

5

5

4

10 

4x1,5 mm²

13 

11 

11 

10 

12 

Pic. 3

Pic. 4

The electric cable must dangle free of 

any impediment during the opening 

and closing movements of the gates.

4x1,5 mm²

FIRST OPERATIONS TO RUN THE PISTON SHAFT 

Before fixing the operator to the gate and gate post, power supply Hindi 880-evo and run the piston shaft fully out; then swap 
the phases and run it 5-6 mm in.

IMPORTANT: then fully screw the ball bearing fixing eye into the shaft (Pic. 4).

IMPORTANT: gate stops in open and closed gate positions are absolutely 
necessary for the proper functioning of Hindi 880-evo.

230 V

Ball bearing 
fixing eye fully
screwed in

Possible  

12,5 μF starting

capacitor

After running the piston shaft 

fully out, swap the phases and 

run it 5-6 mm in.

5-6 mm

!

!

!

!

General layout: it is the installer’s responsibility to lay the connection pipes and tubes as properly and correctly required.

universal oil-hydraulic operator for swing gates

HINDI 880 - evo

4x1 mm²

English

16

blue

common

istr_hindi880evo_GB.ai   4   18/06/2018   11:25:19

Summary of Contents for Hindi 880-Evo

Page 1: ...EN 13241 EN 12453 EN 12445 universal oil hydraulic operator for swing gates GB Instructions manual pages 13 24 13 the gate opener ...

Page 2: ...allation The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier including layout and components of the installation risk analysis verification of safety accessories verification of impact forces and reporting of residual risks INFORMATION FOR END USERS The end user is required to read carefully and to receive information concerni...

Page 3: ...rd is required for the functioning of the operator and has to be externally installed in a sheltered place The electronic unit controls all the moving functions either in automatic or semi automatic modes depending on the user s requirements The operator can come complete with a range of accessories that ensure safety and full control of the operations in any application public or private COMPONEN...

Page 4: ...ss key switch code 371L 13 VIX 53 4 TR code 5313GL 230 V 50 Hz 10 4x1 mm 4x1 5 mm 2x1 mm 4x1 mm 2x1 mm 2x1 mm RG58 1 2x1 mm 2 3 4 5 6 6 7 8 5 9 9 4 10 4x1 5 mm 13 11 11 10 12 Pic 3 Pic 4 The electric cable must dangle free of any impediment during the opening and closing movements of the gates 4x1 5 mm FIRST OPERATIONS TO RUN THE PISTON SHAFT Before fixing the operator to the gate and gate post po...

Page 5: ...hing plates not supplied by the manufacturer Reinforcement patching plate optional With heavy installations it is recommended to provide a plate adequate to the gate type PREPARING THE FIXING PLATES First weld the front and rear fixing plates to the patching plates Pic 5 after assessing the installation measurements as indicated in Pic 6 and Pic 7 or in Pic 8 in the case where opening is required ...

Page 6: ...he locknut hard by means of a 19 wrench Holding spanner included it allows for the piston shaft to be hold steady while the locknut is being tightened Operator rear fixing Operator front fixing It is always recommended before the operator fixing is finally completed that a few manual tests be carried out with Hindi 880 evo to assess that the installation distances are correct Pic 7 FIXING GEOMETRY...

Page 7: ...NOTE WELL the oil hydraulic operator Hindi 880 evo comes FACTORY PRE SET as a bidirectional locking and non braking unit HYDRAULIC LOCKING IN CLOSED POSITION version In case of power failure the gate can only be closed by hand Tighten through the end ONLY the CLOSING by pass avoid overtightening and unscrew the OPENING by pass by 2 turns maximum To unlock and manually operate the gate use the rele...

Page 8: ... slightly undo this screw to adjust the braking speed during the last stretch of the piston stroke Non BRAKING ON OPENING version Loosen the adjusting screw by 1 2 turns max Braking on opening adjusting screw Braking on closing adjusting screw Pic 15 Pic 16 Pic 17 Pic 18 Loosen Loosen Coded key to open the cover lid To unlock turn anti clockwise by 1 2 turns Braking Braking Inner manual release ke...

Page 9: ...o be fitted to the gate leaf closing first Electric lock catching plate to be fixed to the ground Gate stop plate in closed position Horizontal electric lock Vertical electric lock Screwdriver to adjust power Pic 19 Pic 20 Pic 21 ADJUSTING THE THRUST POWER In order to adjust the thrust power in opening and closing loosen or tighten the screws located inside the valve block cover to be accessed by ...

Page 10: ... slit Rear cap Slit allowing the gland and power supply cable to pass through it Cover front plug Hexagonal grommet nuts use the supplied spanner to remove them Operator cover Pic 22 Pic 23 FITTING THE REAR PROTECTION CAP AND COVER FIXING NOTE WELL The power supply electric cable is ALWAYS to be positioned on the side opposite the rear fixing plate between the bolt and the operator end casting uni...

Page 11: ...or model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by using Fadini original spare parts This document for the data included in it must be made available to authorized inspectors off...

Page 12: ...requency of use very intensive Duty cycle P5 opening 17 s dwell 30 s closing 21 s dwell 40 s Time of one complete cycle 108 s Complete cycles n 33 hour Annual cycles 8 hours per day n 81 760 cycles universal oil hydraulic operator for swing gates HINDI 880 evo English 24 Via Mantova 177 A 37053 Cerea VR Italy Ph 39 0442 330422 Fax 39 0442 331054 info fadini net www fadini net GB 2012 19 UE Directi...

Reviews: