universal oil-hydraulic operator for swing gates

HINDI 880 - evo

English

18

Pic. 8

Pic. 9

FIXING THE OPERATOR

Once finished with the mounting plates, 

unscrew the ball bearing eye by 5-6 mm 

(the center distance with the locknut to be 

25-30 mm

): in this way a certain amount of thrust force to close direction is ensured with the gate/s in closed position.

Important:

 eventually tighten the locknut hard with the help of the holding spanner supplied with the equipment.

Fasten Hindi 880-evo on to the mounting plates by means of the supplied bolt and circlips (Pic. 9).

FIXING GEOMETRY FOR THE GATE TO OPEN OUTWARDS

Closed position 
gate stop

B

80 (with 280 mm stroke)
100 (with 400 mm stroke)

stroke (mm) 

 

  A 

 

  B

280 

 

  100 

 170

400 

 

  180 

 210

Fixing distances for 

95° 

opening

25-30 mm

NOTE WELL:

Tighten the locknut 

hard by means of a

19 wrench

Holding spanner included: it allows for 
the piston shaft to be hold steady while 
the locknut is being tightened

Operator rear 

fixing

Operator front

fixing

!

It is always recommended, before the operator fixing is finally completed, that a few manual 
tests be carried out with Hindi 880-evo to assess that  the installation distances are correct.

!

Pic. 7

FIXING GEOMETRY FOR THE GATE TO OPEN INWARDS

Closed position

gate stop

B

80 (with 150 and 280 mm strokes)
100 (with 400 mm stroke)

stroke (mm) 

 

   A 

 

   B

150 

 

 

  60 

 

  80

280 (non braking) 

130 

 

130

280 

(braking) 

 120 

 130

400 (non braking) 

210 

 

180

400 

(braking) 

 200 

 160

Fixing distances for 

95° 

opening

stroke (mm) 

 

  A 

 

   B

280 (non braking) 

130 

 

  85

280 

(braking) 

 130 

  

 

80

400 (non braking) 

190 

 

120

400 (braking) 

 

200 

 

  90

Fixing distances for 

120° 

opening

It is always recommended, before the operator fixing is finally completed, that a few manual 
tests be carried out with Hindi 880-evo to assess that the installation distances are correct.

!

istr_hindi880evo_GB.ai   6   18/06/2018   11:25:21

Summary of Contents for Hindi 880-Evo

Page 1: ...EN 13241 EN 12453 EN 12445 universal oil hydraulic operator for swing gates GB Instructions manual pages 13 24 13 the gate opener ...

Page 2: ...allation The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier including layout and components of the installation risk analysis verification of safety accessories verification of impact forces and reporting of residual risks INFORMATION FOR END USERS The end user is required to read carefully and to receive information concerni...

Page 3: ...rd is required for the functioning of the operator and has to be externally installed in a sheltered place The electronic unit controls all the moving functions either in automatic or semi automatic modes depending on the user s requirements The operator can come complete with a range of accessories that ensure safety and full control of the operations in any application public or private COMPONEN...

Page 4: ...ss key switch code 371L 13 VIX 53 4 TR code 5313GL 230 V 50 Hz 10 4x1 mm 4x1 5 mm 2x1 mm 4x1 mm 2x1 mm 2x1 mm RG58 1 2x1 mm 2 3 4 5 6 6 7 8 5 9 9 4 10 4x1 5 mm 13 11 11 10 12 Pic 3 Pic 4 The electric cable must dangle free of any impediment during the opening and closing movements of the gates 4x1 5 mm FIRST OPERATIONS TO RUN THE PISTON SHAFT Before fixing the operator to the gate and gate post po...

Page 5: ...hing plates not supplied by the manufacturer Reinforcement patching plate optional With heavy installations it is recommended to provide a plate adequate to the gate type PREPARING THE FIXING PLATES First weld the front and rear fixing plates to the patching plates Pic 5 after assessing the installation measurements as indicated in Pic 6 and Pic 7 or in Pic 8 in the case where opening is required ...

Page 6: ...he locknut hard by means of a 19 wrench Holding spanner included it allows for the piston shaft to be hold steady while the locknut is being tightened Operator rear fixing Operator front fixing It is always recommended before the operator fixing is finally completed that a few manual tests be carried out with Hindi 880 evo to assess that the installation distances are correct Pic 7 FIXING GEOMETRY...

Page 7: ...NOTE WELL the oil hydraulic operator Hindi 880 evo comes FACTORY PRE SET as a bidirectional locking and non braking unit HYDRAULIC LOCKING IN CLOSED POSITION version In case of power failure the gate can only be closed by hand Tighten through the end ONLY the CLOSING by pass avoid overtightening and unscrew the OPENING by pass by 2 turns maximum To unlock and manually operate the gate use the rele...

Page 8: ... slightly undo this screw to adjust the braking speed during the last stretch of the piston stroke Non BRAKING ON OPENING version Loosen the adjusting screw by 1 2 turns max Braking on opening adjusting screw Braking on closing adjusting screw Pic 15 Pic 16 Pic 17 Pic 18 Loosen Loosen Coded key to open the cover lid To unlock turn anti clockwise by 1 2 turns Braking Braking Inner manual release ke...

Page 9: ...o be fitted to the gate leaf closing first Electric lock catching plate to be fixed to the ground Gate stop plate in closed position Horizontal electric lock Vertical electric lock Screwdriver to adjust power Pic 19 Pic 20 Pic 21 ADJUSTING THE THRUST POWER In order to adjust the thrust power in opening and closing loosen or tighten the screws located inside the valve block cover to be accessed by ...

Page 10: ... slit Rear cap Slit allowing the gland and power supply cable to pass through it Cover front plug Hexagonal grommet nuts use the supplied spanner to remove them Operator cover Pic 22 Pic 23 FITTING THE REAR PROTECTION CAP AND COVER FIXING NOTE WELL The power supply electric cable is ALWAYS to be positioned on the side opposite the rear fixing plate between the bolt and the operator end casting uni...

Page 11: ...or model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by using Fadini original spare parts This document for the data included in it must be made available to authorized inspectors off...

Page 12: ...requency of use very intensive Duty cycle P5 opening 17 s dwell 30 s closing 21 s dwell 40 s Time of one complete cycle 108 s Complete cycles n 33 hour Annual cycles 8 hours per day n 81 760 cycles universal oil hydraulic operator for swing gates HINDI 880 evo English 24 Via Mantova 177 A 37053 Cerea VR Italy Ph 39 0442 330422 Fax 39 0442 331054 info fadini net www fadini net GB 2012 19 UE Directi...