GENERAL WARNINGS FOR PEOPLE SAFETY

INTRODUCTION 

This operator is designed for a specific scope of applications as 
indicated in this manual, including safety, control and signaling 
accessories as minimum required with 

FADINI

 equipment. 

 

Any applications not explicitly included in this manual may 
cause operation problems or damages to properties and 
people. 

 Meccanica Fadini snc is not liable for damages 

caused by the incorrect use of the equipment, or for 
applications not included in this manual or for malfunctioning 
resulting from the use of materials or accessories not 
recommended by the manufacturer. 

 The  manufacturer 

reserves the right to make changes to its products without 
prior notice. 

 All that is not explicitly indicated in this manual

is to be considered not allowed.

BEFORE INSTALLATION

Before commencing operator installation assess the suitability 
of the access, its general condition and the structure. 

 Make 

sure that there is no risk of impact, crushing, shearing, 
conveying, cutting, entangling and lifting situations, which 
may prejudice people safety. 

 Do not install near any source of 

heat and avoid contacts with flammable substances. 

 Keep all 

the accessories able to turn on the operator (transmitters, 
proximity readers, key-switches, etc) out of the reach of the 
children. 

 Transit through the access only with stationary 

operator. 

 Do not allow children and/or people to stand in the 

proximity of a working operator. 

 To ensure safety in the 

whole movement area of a gate it is advisable to install 
photocells, sensitive edges, magnetic loops and detectors. 

 

Use yellow-black strips or proper signals to identify dangerous 
spots. 

 Before cleaning and maintenance operations, 

disconnect the appliance from the mains by switching off the 
master switch. 

 If removing the actuator, do not cut the 

electric wires, but disconnect them from the terminal box by
loosening the screws inside the junction box.

INSTALLATION

All installation operations must be performed by a qualified 
technician, in observance of the Machinery Directive 
2006/42/CE and safety regulations EN 12453 - EN 12445. 

Verify the presence of a thermal-magnetic circuit breaker
0,03 A - 230 V - 50 Hz upstream the installation. 

 Use 

appropriate objects to test the correct functionality of the 
safety accessories, such as photocells, sensitive edges, etc. 

 

 

Carry out a risk analysis by means of appropriate instruments 
measuring the crushing and impact force of the main opening 
and closing edge in compliance with EN 12445. 

 Identify the 

appropriate solution necessary to eliminate and reduce such
risks. 

  In case where the gate to automate is equipped with a 

pedestrian entrance, it is appropriate to prepare the system in 
such a way to prohibit the operation of the engine when the 
pedestrian entrance is used. 

 Apply safety nameplates with CE 

marking on the gate warning about the presence of an 
automated installation. 

 The installer must inform and instruct 

the end user about the proper use of the system by releasing 
him a technical dossier, including: layout and components of 
the installation, risk analysis, verification of safety accessories, 
verification of impact forces and reporting of residual risks.

INFORMATION FOR END-USERS

The end-user is required to read carefully and to receive 
information concerning only the operation of the installation 
so that he becomes himself responsible for the correct use of it. 

 The end-user shall establish a written maintenance contract 

with the installer/maintenance technician (on -call). 

 Any 

maintenance operation must be done by qualified technicians. 

 Keep these instructions carefully.

WARNINGS FOR THE CORRECT OPERATION OF THE 
INSTALLATION

 

For optimum performance of system over time according to 
safety regulations, it is necessary to perform proper 
maintenance and monitoring of the entire installation: the 
automation, the electronic equipment and the cables 
connected to these. 

 The entire installation must be carried 

out by qualified technical personnel, filling in the Maintenance 
Manual indicated in the Safety Regulation Book (to be 
requested or downloaded from the site 
www.fadini.net/supporto/downloads). 

 Operator: maintenance inspection at least every 6 months, 

while for the electronic equipment and safety systems an 
inspection at least once every month is required. 

 The 

manufacturer, Meccanica Fadini snc, is not responsible for 
non-observance of good installation practice and incorrect 
maintenance of the installation.

DISPOSAL OF MATERIALS

Dispose properly of the packaging materials such as 
cardboard, nylon, polystyrene etc. through specializing 
companies (after verification of the regulations in force at the 
place of installation in the field of waste disposal). Disposal of 
electrical and electronic materials: to remove and dispose 
through specializing companies, as per Directive 2012/19/UE. 
Disposal of substances hazardous for the environment is
prohibited

.

Meccanica Fadini s.n.c.

Director in charge

CE DECLARATION OF CONFORMITY of the manufacturer:

Meccanica Fadini snc (Via Mantova, 177/A - 37053 Cerea - VR - Italy) declares under own responsibility that: 

Hindi 880-evo

 

complies with the 2006/42/CE Machinery Directive, and also that it is sold to be installed in an “automatic system”, along 
with original accessories and components as indicated by the manufacturing company.  An automatic gate operator is, by 
law, a “machinery” and therefore the installer must fit the equipment with all of the applicable safety norms. The installer is 
also required to issue the installer’s Declaration of Conformity.  The manufacturer is not liable for possible incorrect use of 
the product. The product complies with the following specific norms: analysis of the risks and subsequent action to cure 
them as per EN 12445 and EN 12453,  Low Voltage Directive 2014/35/UE, Electromagnetic Compatibility 2014/30/UE.
In order to certify the product, the manufacturer declares under own responsibility the compliance with the EN 13241-1 
PRODUCT NORMS.
Tested and certified:        marking and type testing according to ITT PDC No. 2392-2008.

istr_hindi880evo_GB.ai   2   18/06/2018   11:25:19

Summary of Contents for Hindi 880-Evo

Page 1: ...EN 13241 EN 12453 EN 12445 universal oil hydraulic operator for swing gates GB Instructions manual pages 13 24 13 the gate opener ...

Page 2: ...allation The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier including layout and components of the installation risk analysis verification of safety accessories verification of impact forces and reporting of residual risks INFORMATION FOR END USERS The end user is required to read carefully and to receive information concerni...

Page 3: ...rd is required for the functioning of the operator and has to be externally installed in a sheltered place The electronic unit controls all the moving functions either in automatic or semi automatic modes depending on the user s requirements The operator can come complete with a range of accessories that ensure safety and full control of the operations in any application public or private COMPONEN...

Page 4: ...ss key switch code 371L 13 VIX 53 4 TR code 5313GL 230 V 50 Hz 10 4x1 mm 4x1 5 mm 2x1 mm 4x1 mm 2x1 mm 2x1 mm RG58 1 2x1 mm 2 3 4 5 6 6 7 8 5 9 9 4 10 4x1 5 mm 13 11 11 10 12 Pic 3 Pic 4 The electric cable must dangle free of any impediment during the opening and closing movements of the gates 4x1 5 mm FIRST OPERATIONS TO RUN THE PISTON SHAFT Before fixing the operator to the gate and gate post po...

Page 5: ...hing plates not supplied by the manufacturer Reinforcement patching plate optional With heavy installations it is recommended to provide a plate adequate to the gate type PREPARING THE FIXING PLATES First weld the front and rear fixing plates to the patching plates Pic 5 after assessing the installation measurements as indicated in Pic 6 and Pic 7 or in Pic 8 in the case where opening is required ...

Page 6: ...he locknut hard by means of a 19 wrench Holding spanner included it allows for the piston shaft to be hold steady while the locknut is being tightened Operator rear fixing Operator front fixing It is always recommended before the operator fixing is finally completed that a few manual tests be carried out with Hindi 880 evo to assess that the installation distances are correct Pic 7 FIXING GEOMETRY...

Page 7: ...NOTE WELL the oil hydraulic operator Hindi 880 evo comes FACTORY PRE SET as a bidirectional locking and non braking unit HYDRAULIC LOCKING IN CLOSED POSITION version In case of power failure the gate can only be closed by hand Tighten through the end ONLY the CLOSING by pass avoid overtightening and unscrew the OPENING by pass by 2 turns maximum To unlock and manually operate the gate use the rele...

Page 8: ... slightly undo this screw to adjust the braking speed during the last stretch of the piston stroke Non BRAKING ON OPENING version Loosen the adjusting screw by 1 2 turns max Braking on opening adjusting screw Braking on closing adjusting screw Pic 15 Pic 16 Pic 17 Pic 18 Loosen Loosen Coded key to open the cover lid To unlock turn anti clockwise by 1 2 turns Braking Braking Inner manual release ke...

Page 9: ...o be fitted to the gate leaf closing first Electric lock catching plate to be fixed to the ground Gate stop plate in closed position Horizontal electric lock Vertical electric lock Screwdriver to adjust power Pic 19 Pic 20 Pic 21 ADJUSTING THE THRUST POWER In order to adjust the thrust power in opening and closing loosen or tighten the screws located inside the valve block cover to be accessed by ...

Page 10: ... slit Rear cap Slit allowing the gland and power supply cable to pass through it Cover front plug Hexagonal grommet nuts use the supplied spanner to remove them Operator cover Pic 22 Pic 23 FITTING THE REAR PROTECTION CAP AND COVER FIXING NOTE WELL The power supply electric cable is ALWAYS to be positioned on the side opposite the rear fixing plate between the bolt and the operator end casting uni...

Page 11: ...or model Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by using Fadini original spare parts This document for the data included in it must be made available to authorized inspectors off...

Page 12: ...requency of use very intensive Duty cycle P5 opening 17 s dwell 30 s closing 21 s dwell 40 s Time of one complete cycle 108 s Complete cycles n 33 hour Annual cycles 8 hours per day n 81 760 cycles universal oil hydraulic operator for swing gates HINDI 880 evo English 24 Via Mantova 177 A 37053 Cerea VR Italy Ph 39 0442 330422 Fax 39 0442 331054 info fadini net www fadini net GB 2012 19 UE Directi...