NABCO ENTRANCES, INC., S82 W18717 Gemini Drive, Muskego WI 53150, (877) 622-2694, (888) 679-3319 fax Rev 10/13
Models GT300 & GT8300
HEAVY DUTY - SWING DOOR OPERATOR - OVERHEAD CONCEALED
DIVISION 08 – OPENINGS
SECTION 08 42 29.33 SWINGING AUTOMATIC ENTRANCES
Note to Specifier: Articles and paragraphs below may be edited or modified to suit specific project requirements.
Add section numbers and titles per CSI “MasterFormat” and specifier’s standard practice. Contact manufacturer’s
representative to discuss specification modifications, performance requirements, accessories and/or related equipment
that may be applicable to this project.
Part 1 - GENERAL
1.01 DESCRIPTION
A. Furnish and install automatic swing door equipment as indicated on drawings and specifications.
B. Related work specified elsewhere.
(See note to Specifier*)
1. Electrical Supply:
Section________
1.02 REFERENCES
A. American Association of Automatic Door Manufacturers (AAADM) -
www.aaadm.com
B. American National Standards Institute (ANSI) -
www.ansi.org
C. Builders’ Hardware Manufacturers Association (BHMA) -
www.buildershardware.com
D. Underwriters Laboratory, Inc. (UL) -
www.ul.com
E. Canadian Standards Association (CSA) -
www.csa.ca
F. National Fire Protection Association (NFPA) -
www.nfpa.org
G. International Code Council (ICC) -
www.iccsafe.org
1.03 QUALITY ASSURANCE
A. Manufacturer’s Qualifications: Manufacturer to have at least (5) five years experience in the fabrication of automatic
entrance systems.
B. Installer’s Qualifications: Products specified shall be represented by a factory authorized and trained distributor.
Distributor shall be AAADM Certified, maintain a parts inventory and have trained service personnel with experience
installing and maintaining units indicated for this project.
C. All automatic equipment to comply with UL325 (USA and Canada).
D. All automatic equipment to comply with ANSI A156.10.
1.04 SUBMITTALS
A. Product Data: Submit manufacturer’s product and complete installation data for all materials covered in this section.
B. Shop Drawings: Submit complete elevations, details and methods of anchorage to location; installation of hardware; size,
shape, joints and connections; and details of joining with other construction.
C. Templates and Diagrams: As needed shall be furnished to fabricators and installers of related work for coordination of
swinging door system with concrete work, electrical work, and other related work.
D. A copy of appropriate manuals shall be provided to owner / contractor upon completion of installation.
1.05 SUBSTITUTIONS
GT SYSTEM 300 & 8300 OVERHEAD
CONCEALED (OHC)
SUGGESTED ARCHITECTURAL SPECIFICATIONS
SECTION 8
AUTOMATIC ENTRANCE SYSTEMS