
9
- Drill the holes in the specified securing points and
secure the support on the wall in the four indicated
points.
- Re-position the cover of the control unit on its wall
support and secure the screw.
AP
EFF
TEST
2 secs.
Passage open signal
Alarm memory-stored / In progress
Maintenance Program mode
Alarm ON / Alarm OFF
System sabotage alarm
Discharged batteries
Peripheral units fault /
Telephone line fault
Cable route
Securing
screws
Self-protection route
Insert the cable with the RJ11 plug, taking care
not to crush it.
- Connect the RJ11 plug to the control unit via
the supplied pre-wired socket (long side).
- Connect the RJ11 plug to the entry-point of
the telephone line via the supplied pre-wired
socket (short side).
- Connect the telephones to the RJ11 socket on
the supplied cable.
AP
SUPTEST
2
3
2 secs.
Passage open signal
Peripheral units fault /
Telephone line fault
Discharged batteries
System sabotage alarm
Alarm memory-stored / In progress
Maintenance Program mode
Alarm ON / Alarm OFF
SECURING
- Open the battery compartment with the supplied
key.
- Loosen the two securing screws and remove the
front cover.
Summary of Contents for H4
Page 2: ...2...