background image

Instruction Manual for the  

E-SL 1200 / E-S 1202 Series 

Manufactured by

 

WARNING!

 

Read all instructions before beginning installation or use of this gate 

opener. This operator exerts a high level of force. Exercise caution at 

all times and stay clear of the system during operation.

 

Featuring:

 

Summary of Contents for Estate Slide E-S 1202 Series

Page 1: ...202 Series Manufactured by WARNING Read all instructions before beginning installation or use of this gate opener This operator exerts a high level of force Exercise caution at all times and stay clea...

Page 2: ...EN 12453 and EN 12445 The safety level of the automated system must be C D 10 Before attempting any job on the system cut out electrical power and disconnect the batteries 11 The main power supply of...

Page 3: ...ro mechanical linear operator powered by a 12V DC battery coupled with a control board recharg ing the battery The MASTER card can be programmed and is used to set the following function logics work t...

Page 4: ...e Operator and Limits 6 1 4 Control Board Layout 7 1 Power 8 1 Control Board Pre Learning Preparations 9 1 One Touch EZ Programming 10 1 Programing Gate Movement Variables i e auto close speed force d...

Page 5: ...ch full cycle Operating ambient temperature 4 to 131 F Operator weight lbs 4 85 Protection Class IP 44 Gate leaf max length ft Up to 12 Gate leaf max weight lbs Up to 550 Operator overall dimensions L...

Page 6: ...IMPORTANT Preliminary Checks To ensure safety and an efficiently operating automated system make sure the following conditions are observed The gate and post must be suitable for being automated Chec...

Page 7: ...determined by distance be tween transformer power supply and the control box If the gate is more than 1000 from an a c power supply then an alternate power will be necessary to charge your battery Dep...

Page 8: ...g the battery into the control board fig 1 For charging purposes it is not necessary to hook the receiver to the battery or control board 2 Insert the wires from the supplied AC transformer into the t...

Page 9: ...tive door by turning the slotted lock with a coin or large flat head screw driver 2 Take the supplied key located inside the door fit it in the release system and turn it clockwise un til it reaches t...

Page 10: ...plate 2 The foundation plate must be located as shown in example A right closing or example B left closing to ensure the rack and pinion mesh correctly 3 Secure the foundation plate to the floor usin...

Page 11: ...nections allow the cables to project by about 8 inches from the hole of the foundation plate Operator Installation 1 Position the operator on the plate using the supplied screws as shown below 2 Secur...

Page 12: ...ece of rack as shown below to synchronize the teeth of the two elements 5 More the gate manually and carry out the securing operations as far as the first element proceeding until the gate is fully co...

Page 13: ...Chapter 10 3 Manually take the gate to the open position but allow a space of 2 cm from the travel limit mechanical stop position Slide the magnet on the rack until you see that LED 1 on the control...

Page 14: ...r surge damage be covered under warranty Always separate power from control and safety cables push buttons receivers photocells etc To avoid any electri cal noise use separate sheaths or a shielded ca...

Page 15: ...nsformer plug the battery into the control board The clear plastic clip gets clipped into J4 with the clip side on the left The other side of the battery wire has a clear plastic disconnect that slide...

Page 16: ...and 5 to one of the negative terminals terminals 12 13 14 or 15 We recommend that these jumpers are later replaced with safety devices after learning is complete 2 Connect the power last First connec...

Page 17: ...ion LEDs A B C D E in picture are lit steadily briefly press about 1 second the P2 button The operator or operators start the opening maneuver and the function LEDs begin flashing Wait for the operato...

Page 18: ...ntrols A Switches between Function Logics Function Logics are sets of actions that will occur when an accessory ter minal connection is made or disrupted Each set of actions is designed to give differ...

Page 19: ...AP Stepped Automatic is very similar to automatic A but has a higher amount of safety It has an increased amount of motion stop points 4 EP Stepped Semi automatic is designed to function similar to a...

Page 20: ...rection after interrup tion Opening No effect Reverses direction of motion No effect Stopped in mid cycle Closes the leaf No effect Logic S Logic S safety is designed for higher control and accelerate...

Page 21: ...ion after interruption No effect Stopped in mid cycle Closes the leaf No effect Logic EP Logic EP stepped semi automatic is designed to function similar to a garage door opener At full open the gate d...

Page 22: ...Programming Receiver White Connector Red White Green Jumper Wire Antenna Green White Red Programming 1 Press and release Learn 1 2 Learn Light turns On 3 Press and hold remote button 4 Learn light bl...

Page 23: ...g and or closing pulse for both gate leaves if there is only one leaf it will control the one leaf 2 Single Leaf Open Close Function This is a normally open terminal where by any device i e push butto...

Page 24: ...en they prevent the leaf movement IMPORTANT If a connection is not made from this terminal to one of the negative terminals i e 12 13 14 15 gate closing will not commence 6 N A 7 8 Positive 24 Voltage...

Page 25: ...a tus check will stay active for 5 minutes and then the board returns to all LEDs Off Warning When you access the input status function all accessories are powered even with the gate idle P1 is active...

Page 26: ...ct and crushing Closing Safety Devices They operate only during the gate closing movement and therefore are suitable for protecting the closing zone against the risk of impact Opening Closing Safety D...

Page 27: ...nection of 2 pairs of photocells for closing Connection of 1 pair of photocells for opening Connection of 1 pair of photocells for closing Connection of a pair of closing photocells one for opening an...

Page 28: ...equired to e mail digital photos to the technician This is done in your best interest to save unnecessary shipping expenses and time lost Many times we can come up with solutions to issues by seeing p...