Estate Slide E-SL 1200
Installation of Mounting Hardware
4. Lay the electric cables for connection to the accessories and power supply. To facilitate making connections, allow
the cables to project by about 8 inches from the hole of the foundation plate.
Operator Installation
1. Position the operator on the plate using the supplied screws as shown below.
2. Secure the operator to the foundation plate, tightening the screws as shown below.
3. Prepare the operator for the manual operating mode as described in Section 5.
6.2