Preparing the
Table
This section includes the following topics:
z
Installation Overview
z
Cutout Dimensions
TLP 350CV • Prepare the Table
5
Installation Overview
Planning
z
Determine the optimum furniture location for the TLP 350CV keeping in mind the
following:
z
the size of the enclosure that will be below the table,
z
the orientation of the touch-screen for ease of viewing,
z
the reach distance for a user for convenient operation,
z
clearances for under-table cabling,
z
the location of devices that may be connected to the AAPs both under and on top
of the furniture.
z
Obtain the proper cutout dimensions or a router template for the craftsman cutting the
enclosure opening in the furniture,
z
Determine the number and type of AAPs required by the installation.
Prepare the Cable Cubby enclosure
z
Install the power module,
z
Assemble the pass-through AAPs, install cables, and if applicable install passive AAPs.
Loosely fasten all AAPs to the AAP shelf.
z
Install the AAP shelf assembly into the Cable Cubby enclosure and tighten all AAPs.
Install the Enclosure
z
Mount the TLP 350CV into the furniture opening,
z
Mount and connect the power supply to the TLP 350CV,
z
Connect a LAN,
z
If using the video monitoring capabilities, make all video input connections,
z
Apply power and follow the on-screen instructions to set up the TLP 350CV for first time
operation.