NAV Series TCP/IP Standalone Network Access Controller
6
2
Installation
The
Installation
has
three
procedures
described
as
below.
Each
procedure
will
be
introduced
in
the
following
sections
in
detail.
2.1 Installation
Preparation
Before
installation,
users
are
advised
to
collect
information
properly
which
will
make
the
installation
more
smoothly
and
helps
to
reduce
time
and
energy
cost.
For
professional
constructors,
the
information
below
will
be
of
great
use.
2.1.1 Obtain a Floor Plan
Obtain
a
floor
plan
of
the
building
in
which
the
access
control
system
is
to
be
installed.
Obtaining
a
floor
plan
helps
the
installer
determine
what
components
need
to
be
installed,
Chapter
2
Step
1:
Installation
Preparation
Obtain
a
floor
plan
Determine
the
hardware
and
location
Determine
the
number
of
controllers
according
to
system
structure
Step
2:
Hardware
Installation
Installing
the
controller
Connecting
to
the
door
lock
/
open
button
/
sensor
/
bell
Connecting
to
the
alarm
input
/
output
Connecting
to
the
card
reader
Connecting
to
the
computer
through
the
networkMount
a
backup
battery
in
the
enclosure
Step
3:
Software
Setup
/
Configuration
Log
in
controller
built
‐
in
software
through
IE
on
computer
Set
user
account
for
user
software
Set
controller
and
other
equipment
Set
holidays,
shifts
and
door
Access
Rule
Log
in
card
and
set
card
attributes